Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Zero-Retrofit Robotic Ammunition Handling for the MK 45 Mod 4, 5-Inch Gun Magazine

DOW NAVY. Closes 6 Jan 2027.

At a glance

Zero-Retrofit Robotic Ammunition Handling for the MK 45 Mod 4, 5-Inch Gun Magazine is an SBIR or STTR topic from DOW NAVY. Applications close 6 Jan 2027. It was posted 4 Nov 2026. The funding number is 27.BZ topic DON27BZ02-NV024. It is offered as an SBIR or STTR. The funder's notice has the documents and how to apply.

Overview

Funder
DOW NAVY
Place
Not stated
Type
SBIR or STTR topic
Funding number
27.BZ topic DON27BZ02-NV024
Status
Open

Key dates

Posted
4 Nov 2026
Closes
6 Jan 2027
Time and time zone
Not stated. Check the buyer's notice.

Summary

The funder's description, as posted.

The tight confines of a DDG 51 5-Inch ammunition magazine present a difficult challenge for automation. Traditional robotic arms require fixed mounting and large clearance envelopes, requiring complete compartment redesigns. To avoid extensive shipyard work, the robotic prototype must adapt to the ship. The prototype must navigate narrow aisles, step over "knee-knocker" coamings, and load ammunition into the existing hoists and stowage racks alongside or in place of human sailors. The robotic prototype must execute capture and lift of 70-pound projectiles and their propelling charges, change their orientations while captured (i.e., pivot), move ammunition between stowage racks and hoists, and safely place the projectiles into the stowage racks and hoists in the proper orientation. Furthermore, the prototype must keep kinematic stability in high sea states (up to Sea State 5) while being able to continue to complete its tasking. The prototype must be resilient to electromagnetic interference (EMI)/electromagnetic pulse (EMP), and have a power supply architecture that enables sustained fire missions without the need for recharge or obstructive cables, and ability to rapidly swap power supplies without substantial downtime. KEY PARAMETERS FOR ZERO-RETORFIT INTEGRATION: - Payload Capacity: Continuous capability to lift, pivot, and load 70-pound projectiles and associated propelling charges. System must meet a minimum Threshold of 6 rounds per minute, with an Objective of 12 rounds per minute. - Form Factor: Must fit within standard 24-inch shipboard aisles and maneuver in confined magazine spaces. - Locomotion: Able to traverse standard deck plating, step over 6-inch coamings, and brace against ship motion. - Stability: Maintain balance and load control up to and during Sea State 5 conditions (significant pitch/roll/heave). - Power: Minimum 2-hour continuous operational endurance with rapidly hot-swappable battery packs (changeable in under 60 seconds). - Hardening: Built to Military Standard (MIL-STD)-461 (EMI/EMP) and MIL-S-901D (Shock) thresholds. - Safety/Fallback: Zero-retrofit integration (i.e., no structural alteration), ensuring the space stays 100-percent operational by human fallback crews in case of robot failure. - Explosive Safety: Must adhere to NAVSEA OP 4 protocols for the safe physical handling of ordnance (Note: meeting specific electrical power level compliance is out of scope for this effort). Proposals are taken for Phase I and Phase II. Its technical points of contact take questions directly until 2026-12-02. Written questions are taken on DSIP until 2026-12-23.

Eligibility and award

Funding type
SBIR or STTR

Official notice

The funder's own page for this notice, with its documents and any changes.

Read the funder's notice

All sbir and sttr topics
  1. SEED Company Showcase Participation at Biotech Showcase 2027 for NIH SBIR/STTR Recipients

    NATIONAL INSTITUTES OF HEALTH OLAO (HEALTH AND HUMAN SERVICES, DEPARTMENT OF), MD

    Closes30 Nov 2026

  2. DHS SMALL BUSINESS INNOVATION RESEARCH (SBIR) PROGRAM FY27 PRE-SOLICITATION

    SCI TECH ACQ DIV (HOMELAND SECURITY, DEPARTMENT OF), DC

    Closes7 Dec 2026

  3. DON SBIR/STTR PMO and ONR SBIR/STTR Programs

    OFFICE OF NAVAL RESEARCH (DEPT OF DEFENSE), VA

    Closes7 Dec 2026

  4. Small Business Innovation Research (SBIR) Phase I Subtopic Pre-release

    NASA SHARED SERVICES CENTER (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION)

    Closes7 Dec 2026

  5. Closes7 Dec 2026

  6. Closes16 Dec 2026

  7. Closes16 Dec 2026

  8. Closes16 Dec 2026

Track it in Capveon

Read the documents, check the eligibility against your organization and keep the deadline in front of your team.

Track this grantSee every open grant