Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

RFI Other Transaction Authority (OTA) FY28 Fort Bliss Microgrid Construction Services

ClosedW072 ENDIST LOUISVILLE (DEPT OF DEFENSE), Texas. Closed 11 Nov 2026.

At a glance

RFI Other Transaction Authority (OTA) FY28 Fort Bliss Microgrid Construction Services is a funding notice from W072 ENDIST LOUISVILLE (DEPT OF DEFENSE), in Texas. Applications closed 11 Nov 2026. It is closed and no longer taking applications. It was posted 5 Nov 2026. The funding number is W912QR-FY28FTBLISS-OTA. It is offered as an other transaction. The funder's notice has the documents and how to apply.

Overview

Funder
W072 ENDIST LOUISVILLE (DEPT OF DEFENSE)
Place
Texas
Type
Funding notice
Funding number
W912QR-FY28FTBLISS-OTA
Status
Closed

Key dates

Posted
5 Nov 2026
Closes
11 Nov 2026
Time and time zone
Not stated. Check the buyer's notice.

Summary

The funder's description, as posted.

The U.S. Army Corps of Engineers (USACE), Louisville District, is considering to award two (2) sole-source agreements in Fiscal Year 2028 (FY28) to the Rio Grande Electric Cooperative (RGEC), the privatized electrical utility provider for Fort Bliss. The Government contemplates four (4) acquisitions consolidated into two (2) separate projects. The acquisitions will be executed utilizing Progressive Design-Build (PDB) or Construction Management At Risk (CM@R) delivery method under the Other Transaction Authority (OTA), as authorized by 10 U.S.C. Section 2808a. Industry is encouraged to detail and submit their experience executing projects utilizing OTA via the questionnaire attachment included in this notice. Interested firms may also add themselves to the interested vendors list. The contemplated awards require the design, integration, and construction of four (4) Power Generation and Microgrid Systems at Fort Bliss Garrison in Fort Bliss, Texas. In alignment with the Installation Energy and Water Plan (IEWP), these systems will provide continuous emergency backup power to critical mission facilities for a minimum of 14 consecutive calendar days during a commercial utility grid outage. Because RGEC owns and operates the installation's electrical distribution infrastructure, the Government anticipates that RGEC is uniquely positioned to integrate these microgrid systems without compromising system integrity, safety, or operational readiness, and sole sourcing attenuates the risk of future stranded assets. Agreement sets 1 and 2 are described below: Fort Bliss Agreement 1: Project Delivery Method - Construction Management at Risk 1a. Fort Bliss Directorate of Plans, Training, Mobilization, and Security (DPTMS) training campus The DPTMS training campus includes six mission critical facilities that will receive resilient power during electrical grid outages from the new microgrid. The project requires the construction of a microgrid that includes of 5,600KW of natural gas generators enclosed in weather housing, 2,000 KWdc Photovoltaic (PV) arrays, a 1,000KW Battery Energy Storage System (BESS), microgrid, transformers, controls, and switches. The project will also include utilities, site improvements and communication infrastructure. Modification to the privatized utility system owner's existing infrastructure is required to accommodate the tie in of the microgrid system. 1b.Fort Bliss McGregor Range Construct a microgrid consisting of 4,200 kW of diesel power generation enclosed in weather housing, 1,500 kW(dc) of photovoltaic power generation, a 1,000 kW Battery Energy Storage System (BESS), fuel storage with initial fill, and a power line connecting the generators to the microgrid. The project will provide microgrid controls, transformers, switches, commissioning and testing, and cybersecurity. Supporting facilities include electric service, site improvements, information systems, environmental air permitting, software and other upgrades to the existing combined heat and power systems, and an interconnection agreement. Modifications to the privatized utility system owner's existing infrastructure to accommodate the tie in of the government's microgrid is included and will be funded as a privatized utility connection and service fee. The McGregor Range has an average electrical demand of 1,330KW and a total peak critical load demand of 2,850KW. The proposed project will provide resilient backup power for 100% of the critical loads for the McGregor Range. ___________________________________________________________________________________ Fort Bliss Agreement 2 Project Delivery Method - Progressive Design Build 2a.Fort Bliss Combat Aviation Brigade (CAB) Construct a microgrid that includes a total of 5,600KW of natural gas generators enclosed in weather housing, 2,000KWdc Photovoltaic (PV) arrays, a 1,000KW Battery Energy Storage System (BESS), microgrid, transformers, controls, and switches. This project will also include…

Shortened here. The full text is in the buyer's notice.

Eligibility and award

Funding type
Other transaction
NAICS code
237130
Product or service code
Y1NZ

Official notice

The funder's own page for this notice, with its documents and any changes.

Read the funder's notice

  1. Closes5 Apr 2029

  2. Closes30 Nov 2026

  3. Closes30 Nov 2026

  4. Closes30 Nov 2026

  5. Closes30 Nov 2026

  6. Closes1 Dec 2026

  7. Announcement for Partnership Proposals: Atmospheric Exploration Observatory

    NASA HEADQUARTERS (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION), DC

    Closes2 Dec 2026

  8. C--Broad Agency Announcement (BAA) 3DNTM

    OFC OF ACQUISITION GRANTS-DENVER (INTERIOR, DEPARTMENT OF THE)

    Closes4 Dec 2026

Find the next one

This one has closed. Every open grant is listed by kind and by state.

See every open grant