Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Rapid Thermoplastic Patching Capability for Legacy Thermoset Airframe Sustainment

DOW NAVY. Closes 6 Jan 2027.

At a glance

Rapid Thermoplastic Patching Capability for Legacy Thermoset Airframe Sustainment is an SBIR or STTR topic from DOW NAVY. Applications close 6 Jan 2027. It was posted 4 Nov 2026. The funding number is 27.BZ topic DON27BZ02-NV018. It is offered as an SBIR or STTR. The funder's notice has the documents and how to apply.

Overview

Funder
DOW NAVY
Place
Not stated
Type
SBIR or STTR topic
Funding number
27.BZ topic DON27BZ02-NV018
Status
Open

Key dates

Posted
4 Nov 2026
Closes
6 Jan 2027
Time and time zone
Not stated. Check the buyer's notice.

Summary

The funder's description, as posted.

Current composite airframe repair methodologies rely on a combination of wet-layups, B-staged epoxy prepregs, and bonded pre-cured thermoset patches. While pre-cured patches are the standard for high-quality depot repairs due to their autoclave-consolidated strength and "inspectability", they present significant operational and logistical limitations. All these traditional methods require secondary adhesive bonding (using paste or film adhesives) to attach the repair to the airframe. This secondary bond is the inherent weak link of the repair, demanding long thermal cure cycles (often 4 to 24 hours), strict environmental controls, and burdensome cold-storage logistics (freezers) for the B-staged resins and adhesives. Furthermore, these out-of-autoclave epoxy repairs often struggle to meet the high service temperature requirements of advanced tactical aircraft. This SBIR topic seeks to evolve the current pre-cured repair methodology by transitioning from secondary adhesive bonding to high-speed fusion welding. The objective is to develop the capability to use pre-consolidated, high-temperature thermoplastic patches (e.g., Carbon/PEEK, Carbon/PEKK) on legacy thermoset aircraft (epoxy/Bismaleimide [BMI]). By replacing the lengthy adhesive cure cycle with a rapid welding process, this technology aims to achieve flight-ready repairs in expeditionary and carrier-based environments in a fraction of the time. Because thermoplastics melt and thermosets do not, achieving a structural weld between these dissimilar materials is the primary barrier to fielding this capability. The Department of War seeks complete thermoplastic patching solutions that incorporate the requisite chemical or mechanical interfacial enablers-such as plasma surface activation, novel chemical tie-layers, or laser-ablated mechanical interlocking. These enablers must allow the thermoplastic patch to successfully fuse with a fully cured, legacy thermoset airframe using portable ultrasonic, resistance- or -induction welding equipment. The outcome must be a deployable repair process that eliminates cold-storage logistics, restores full structural integrity, meets high service temperature demands, and drastically reduces Aircraft on Ground (AOG) time. Proposals are taken for Phase I and Phase II. Its technical points of contact take questions directly until 2026-12-02. Written questions are taken on DSIP until 2026-12-23.

Eligibility and award

Funding type
SBIR or STTR

Official notice

The funder's own page for this notice, with its documents and any changes.

Read the funder's notice

All sbir and sttr topics
  1. SEED Company Showcase Participation at Biotech Showcase 2027 for NIH SBIR/STTR Recipients

    NATIONAL INSTITUTES OF HEALTH OLAO (HEALTH AND HUMAN SERVICES, DEPARTMENT OF), MD

    Closes30 Nov 2026

  2. DHS SMALL BUSINESS INNOVATION RESEARCH (SBIR) PROGRAM FY27 PRE-SOLICITATION

    SCI TECH ACQ DIV (HOMELAND SECURITY, DEPARTMENT OF), DC

    Closes7 Dec 2026

  3. DON SBIR/STTR PMO and ONR SBIR/STTR Programs

    OFFICE OF NAVAL RESEARCH (DEPT OF DEFENSE), VA

    Closes7 Dec 2026

  4. Small Business Innovation Research (SBIR) Phase I Subtopic Pre-release

    NASA SHARED SERVICES CENTER (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION)

    Closes7 Dec 2026

  5. Closes7 Dec 2026

  6. Closes16 Dec 2026

  7. Closes16 Dec 2026

  8. Closes16 Dec 2026

Track it in Capveon

Read the documents, check the eligibility against your organization and keep the deadline in front of your team.

Track this grantSee every open grant