Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Navy Shipboard Gas Turbine Rotating Detonation Combustor Operation with Diesel Fuel

DOW NAVY. Closes 6 Jan 2027.

At a glance

Navy Shipboard Gas Turbine Rotating Detonation Combustor Operation with Diesel Fuel is an SBIR or STTR topic from DOW NAVY. Applications close 6 Jan 2027. It was posted 4 Nov 2026. The funding number is 27.BZ topic DON27BZ02-NV019. It is offered as an SBIR or STTR. The funder's notice has the documents and how to apply.

Overview

Funder
DOW NAVY
Place
Not stated
Type
SBIR or STTR topic
Funding number
27.BZ topic DON27BZ02-NV019
Status
Open

Key dates

Posted
4 Nov 2026
Closes
6 Jan 2027
Time and time zone
Not stated. Check the buyer's notice.

Summary

The funder's description, as posted.

As background, the typical arrangement used on U.S. Navy surface combatants consists of four (4) large (20+MW class - GE LM-2500) gas turbines for propulsion and three 3 smaller (3 MW class - Rolls Royce 501-K34) gas turbines for ship service electrical power generation. Presently U.S. gas turbine powered warships use simple cycle machines. However, complex cycles with reheat and other cycle enhancements have been considered and analyzed with the potential for increased efficiency. Further examinations have been performed to evaluate improvements in maintainability/reliability, overall generator set power density/stack up length, and alternative configuration installation flexibility for use in overall electric plant designs. RDCs are advanced power-generation and propulsion devices that operate by propagating one or more supersonic detonation waves continuously around an annular chamber. As fresh fuel and oxidizer are continuously injected into the channel, the rotating shock wave rapidly compresses and ignites the mixture, creating a self-sustaining zone of intense heat and pressure. Thermodynamically, RDCs utilize a detonation-driven pressure-gain cycle, which is most accurately modeled by the Fickett-Jacobs-Salsburg (FJS) cycle and frequently approximated as the constant-volume Humphrey cycle. Unlike conventional gas turbines that rely on the constant-pressure Brayton cycle, the FJS detonation cycle in an RDC generates a substantial net increase in total pressure across the combustor. This inherent pressure gain drastically reduces the workload required by upstream mechanical compressors and significantly boosts the overall thermal efficiency and power output of the gas turbine system. While initial government and industry investigations have centered on the use of RDCs in aerospace applications, future shipboard applications will require a greater understanding of the ability to operate with diesel fuel for long continuous operation as well as a quantification of performance benefits that can be achieved in overall shipboard electric architecture design. While not required, discussions with Navy shipboard gas turbine Original Equipment Manufacturers (OEM) are recommended. Proposals are taken for Phase I and Phase II. Its technical points of contact take questions directly until 2026-12-02. Written questions are taken on DSIP until 2026-12-23.

Eligibility and award

Funding type
SBIR or STTR

Official notice

The funder's own page for this notice, with its documents and any changes.

Read the funder's notice

All sbir and sttr topics
  1. SEED Company Showcase Participation at Biotech Showcase 2027 for NIH SBIR/STTR Recipients

    NATIONAL INSTITUTES OF HEALTH OLAO (HEALTH AND HUMAN SERVICES, DEPARTMENT OF), MD

    Closes30 Nov 2026

  2. DHS SMALL BUSINESS INNOVATION RESEARCH (SBIR) PROGRAM FY27 PRE-SOLICITATION

    SCI TECH ACQ DIV (HOMELAND SECURITY, DEPARTMENT OF), DC

    Closes7 Dec 2026

  3. DON SBIR/STTR PMO and ONR SBIR/STTR Programs

    OFFICE OF NAVAL RESEARCH (DEPT OF DEFENSE), VA

    Closes7 Dec 2026

  4. Small Business Innovation Research (SBIR) Phase I Subtopic Pre-release

    NASA SHARED SERVICES CENTER (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION)

    Closes7 Dec 2026

  5. Closes7 Dec 2026

  6. Closes16 Dec 2026

  7. Closes16 Dec 2026

  8. Closes16 Dec 2026

Track it in Capveon

Read the documents, check the eligibility against your organization and keep the deadline in front of your team.

Track this grantSee every open grant