Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Low-cost Mid-wave Infrared Focal-Plane Array (FPA) Fabrication through Direct-bond Interconnection

DOW NAVY. Closes 6 Jan 2027.

At a glance

Low-cost Mid-wave Infrared Focal-Plane Array (FPA) Fabrication through Direct-bond Interconnection is an SBIR or STTR topic from DOW NAVY. Applications close 6 Jan 2027. It was posted 4 Nov 2026. The funding number is 27.BZ topic DON27BZ02-NV011. It is offered as an SBIR or STTR. The funder's notice has the documents and how to apply.

Overview

Funder
DOW NAVY
Place
Not stated
Type
SBIR or STTR topic
Funding number
27.BZ topic DON27BZ02-NV011
Status
Open

Key dates

Posted
4 Nov 2026
Closes
6 Jan 2027
Time and time zone
Not stated. Check the buyer's notice.

Summary

The funder's description, as posted.

Electro-Optic and Infrared (EO/IR) sensors are used in a wide variety of applications, such as navigation, wide-area surveillance, and targeting. Operating in the visible and near-IR bands, EO sensors are available with small pixels and in large arrays at low cost, because the Si-detector wafer and Si-ROIC wafer can be 3D-integrated directly through wafer-to-wafer bonding with high yield at high volume based on material and complementary metal-oxide-semiconductor (CMOS)-process compatibility. By contrast, sensors operating in the MWIR employ III-V detector materials, which are not CMOS-process compatible, while III-V epi-layer detectors cannot be epitaxially grown directly on Si, as required to produce the crystalline order of high-quality detectors [Refs 1-2]. Instead, the III-V detector epi-layer is grown on a lattice-compatible substrate wafer, which is then flip-chip bonded to a Si-ROIC through a dense array of sub-pixel indium bumps placed on each wafer, followed by detector-substrate removal. The technically demanding process of depositing, aligning, and compressing the dense arrays of indium bumps on detector and ROIC die, results in a labor-intensive, inefficient, low-yield process for IR FPA fabrication, which greatly increases cost. In recent years, 3D-heterogeneous integration has enabled a single integrated chip of greater overall functionality to be realized at reduced cost by assembling multiple smaller chips, each having unique functionality, material, node size, and/or foundry origin. Direct-bond interconnection (DBI) [Refs 3-5] is a 3D-heterogeneous integration technique that can potentially enable low-cost MWIR FPA fabrication. In principle, DBI should enable very large format FPAs with small pixels to be fabricated, as the process is largely independent of wafer and pixel size, in contrast to conventional bump-bonding. Moreover, the DBI process utilizes a temperature range that is compatible with MWIR IR detector materials. The goal of this SBIR topic is to demonstrate the use of DBI or a similar process for fabrication of high-performance, large format, small-pixel, MWIR FPAs at low cost with the objective of refining the technique sufficiently to potentially replace conventional bump-bonding. Proposals are taken for Phase I and Phase II. Its technical points of contact take questions directly until 2026-12-02. Written questions are taken on DSIP until 2026-12-23.

Eligibility and award

Funding type
SBIR or STTR

Official notice

The funder's own page for this notice, with its documents and any changes.

Read the funder's notice

All sbir and sttr topics
  1. SEED Company Showcase Participation at Biotech Showcase 2027 for NIH SBIR/STTR Recipients

    NATIONAL INSTITUTES OF HEALTH OLAO (HEALTH AND HUMAN SERVICES, DEPARTMENT OF), MD

    Closes30 Nov 2026

  2. DHS SMALL BUSINESS INNOVATION RESEARCH (SBIR) PROGRAM FY27 PRE-SOLICITATION

    SCI TECH ACQ DIV (HOMELAND SECURITY, DEPARTMENT OF), DC

    Closes7 Dec 2026

  3. DON SBIR/STTR PMO and ONR SBIR/STTR Programs

    OFFICE OF NAVAL RESEARCH (DEPT OF DEFENSE), VA

    Closes7 Dec 2026

  4. Small Business Innovation Research (SBIR) Phase I Subtopic Pre-release

    NASA SHARED SERVICES CENTER (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION)

    Closes7 Dec 2026

  5. Closes7 Dec 2026

  6. Closes16 Dec 2026

  7. Closes16 Dec 2026

  8. Closes16 Dec 2026

Track it in Capveon

Read the documents, check the eligibility against your organization and keep the deadline in front of your team.

Track this grantSee every open grant