Integrated Multi-Spectral Periscope for the Amphibious Combat Vehicle (ACV)
At a glance
Integrated Multi-Spectral Periscope for the Amphibious Combat Vehicle (ACV) is an SBIR or STTR topic from DOW NAVY. Applications close 6 Jan 2027. It was posted 4 Nov 2026. The funding number is 27.BZ topic DON27BZ02-NV008. It is offered as an SBIR or STTR. The funder's notice has the documents and how to apply.
Overview
- Funder
- DOW NAVY
- Place
- Not stated
- Type
- SBIR or STTR topic
- Funding number
- 27.BZ topic DON27BZ02-NV008
- Status
- Open
Key dates
- Posted
- 4 Nov 2026
- Closes
- 6 Jan 2027
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The funder's description, as posted.
Current periscopic vision systems on Marine Corps combat vehicles are limited to daylight optical performance, over a limited Field of View (FoV), and lack the ability to integrate modern digital imaging, thermal, and night vision technologies. The new system shall provide daylight, low-light/night vision, and thermal (IR) imaging capabilities through a single, compact, and modular unit; and enhance situational awareness, target detection, and crew safety for Marines during water, transition, and land operating environments. This SBIR topic seeks to develop an integrated camera-based periscope module that: - Provides visible (Electro-Optical [EO]), night vision (Near-Infrared Low-Level Laser (or Light) [NIR/LLL]), and long-wave infrared (LWIR) imaging in a compact unit. - Is retrofit-compatible with existing periscope housings used in the USMC ACV FOV, or is capable of replacing optical viewports with an electronic display module. - Includes onboard image fusion and low-latency video output for vehicle displays and augmented-reality systems. - Meets ruggedization standards (MIL-STD-810H, MIL-STD-461D, and EC Standard 60529, rating IP66) for temperature, shock, vibration, EMI, dust and water resistance. - Provides hardware resistance to seawater corrosion, as tested in accordance with GMW 14872, "Exterior, Exposure D" as stated in Table A3. - Does not result in significant weight increase over that of the standard periscope. - Supports integration with vehicle electronics architectures, including Vehicular Integration for C4ISR/EW Interoperability (VICTORY) and NATO STANAG 4609 standards. Novel design approaches may include: - Digital overlay in periscope eyepieces, merging optical and sensor imagery for seamless situational awareness. - Edge processing and AI-assisted fusion of EO/NIR/LWIR feeds to highlight threats or movement. - Wireless or wired integration with crew display systems such as: o Integrated Visual Augmentation System (IVAS) o Enhanced Night Vision Goggle - Binocular (ENVG-B) o Joint Mounted Display System (JMDS) Work produced in Phase II may become classified. Note: The prospective contractor(s) must be U.S. owned and operated with no foreign influence as defined by 32 U.S.C. § 2004.20 et seq., National Industrial Security Program Executive Agent and Operating Manual, unless acceptable mitigating procedures can and have been implemented and approved by the Defense Counterintelligence and Security Agency (DCSA) formerly Defense Security Service (DSS). The selected contractor and/or subcontractor must be able to acquire and maintain a secret level facility and Personnel Security Clearances. This will allow contractor personnel to perform on advanced phases of this project as set forth by DCSA and MCSC in order to gain access to classified information pertaining to the national defense of the United States and its allies; this will be an inherent requirement. The selected company will be required to safeguard classified material during the advanced phases of this contract IAW the National Industrial Security Program Operating Manual (NISPOM), which can be found at Title 32, Part 2004.20 of the Code of Federal Regulations. Proposals are taken for Phase I and Phase II. Its technical points of contact take questions directly until 2026-12-02. Written questions are taken on DSIP until 2026-12-23.
Eligibility and award
- Funding type
- SBIR or STTR
Official notice
The funder's own page for this notice, with its documents and any changes.
Related open funding
Closes30 Nov 2026
Closes7 Dec 2026
Closes7 Dec 2026
Closes7 Dec 2026
Closes7 Dec 2026
Closes16 Dec 2026
Closes16 Dec 2026
Closes16 Dec 2026
Track it in Capveon
Read the documents, check the eligibility against your organization and keep the deadline in front of your team.