High Speed Low Size, Weight, and Power (SWaP) Radio Frequency (RF) Communications Systems for Space-to-Space and Space-to-Terrestrial Applications
At a glance
High Speed Low Size, Weight, and Power (SWaP) Radio Frequency (RF) Communications Systems for Space-to-Space and Space-to-Terrestrial Applications is an SBIR or STTR topic from DOW MDA. Applications close 6 Jan 2027. It was posted 4 Nov 2026. The funding number is 27.BZ topic MDA27BZ02-DV003. It is offered as an SBIR or STTR. The funder's notice has the documents and how to apply.
Overview
- Funder
- DOW MDA
- Place
- Not stated
- Type
- SBIR or STTR topic
- Funding number
- 27.BZ topic MDA27BZ02-DV003
- Status
- Open
Key dates
- Posted
- 4 Nov 2026
- Closes
- 6 Jan 2027
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The funder's description, as posted.
Specific to this topic, to support the Missile Defense Agency (MDA) mission of developing and deploying a layered Missile Defense System to defend the United States, its deployed forces, and friends from missile attacks in all phases of flight, the MDA seeks improved defensive communication capabilities by increasing bandwidth of new low size, weight, and power, radios and antennas to gigabyte speeds. Small form-factor (.1L) or less volume and low power (<10 W) RF radio utilizing Ku bands or higher (due to National Telecommunication and Information Administration (NTIA) restrictions) capable of transmitting data at speeds of 1.5Gbps or greater in a natural space environment is desired. Technology should also be capable of burst transmission of data through the atmosphere to flight vehicles at speeds of 1 Gbps or greater. Communications system capable of meshed (self-forming, self-healing network, high probability of delivery network) High Assurance Internet Protocol Encryptors (HAIPE) interactions for inclusion into "Zero Trust" platforms and networks. Solutions should consider frequency diversity, antenna diversification, and advanced modulation and coding schemas for security and jamming prevention. At the end of the Phase II, two flight radio payloads would be the deliverables. Proposals are taken for Phase I and Phase II. Its technical points of contact take questions directly until 2026-12-02. Written questions are taken on DSIP until 2026-12-23.
Eligibility and award
- Funding type
- SBIR or STTR
Official notice
The funder's own page for this notice, with its documents and any changes.
Related open funding
Closes30 Nov 2026
Closes7 Dec 2026
Closes7 Dec 2026
Closes7 Dec 2026
Closes7 Dec 2026
Closes16 Dec 2026
Closes16 Dec 2026
Closes16 Dec 2026
Track it in Capveon
Read the documents, check the eligibility against your organization and keep the deadline in front of your team.