Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Cleaner for the Time Domain Reflectometer Tank Level Indicator

ClosedDOW NAVY. Closed 25 Nov 2026.

At a glance

Cleaner for the Time Domain Reflectometer Tank Level Indicator is an SBIR or STTR topic from DOW NAVY. Applications closed 25 Nov 2026. It is closed and no longer taking applications. It was posted 7 Oct 2026. The funding number is 27.BZ topic DON27BZ01-NV001. It is offered as an SBIR or STTR. The funder's notice has the documents and how to apply.

Overview

Funder
DOW NAVY
Place
Not stated
Type
SBIR or STTR topic
Funding number
27.BZ topic DON27BZ01-NV001
Status
Closed

Key dates

Posted
7 Oct 2026
Closes
25 Nov 2026
Time and time zone
Not stated. Check the buyer's notice.

Summary

The funder's description, as posted.

Develop a technology to clean and potentially reverse fouling on Time Domain Reflectometer (TDR) Tank Level Indicating (TLI) components in-place. The solution must function within fully compensated fuel tanks aboard DDG 51 class ships without requiring depressurization, defueling, or dewatering. Fouling on the TDR sensor used for TLI is a persistent problem. The TDR is necessary to provide accurate and precise readings for fuel measurement. Over time, TDRs can experience sensor fouling through a buildup of crystallization and other contaminants on TDR rods and tubes, contributing to false readings or other failures if not properly maintained and cleaned. The operational readiness of the U.S. Navy's DDG 51 Arleigh Burke-class destroyers is being undermined by a persistent and unsolved equipment failure. The TDR sensors, a TLI technique, which are critical for managing fuel, buoyancy, and stability, are consistently rendered unreliable due to fouling. Current cleaning methods are operationally untenable; they require taking fuel compensating tanks offline, emptying fuel and/or compensating seawater, and significant follow-on maintenance, which directly reduces the Fleet's readiness and deployability. These efforts are not a permanent solution and often fail to resolve the underlying issue, making this a high-priority challenge for the DDG 51 Program Office. The Navy urgently seeks an innovative solution that remedies fouled TDR units without requiring ships to cease operations or undergo costly, invasive maintenance, thereby increasing mission readiness and reducing the risk of fuel spills. Effective methods for cleaning these sensors in-situ are very limited. The existing approach involves decompensation of fuel tanks (removal of fuel and compensating seawater) and manual removal of TDR sensors for cleaning, which can be costly and time consuming. It is not generally feasible while the ship is underway. Removal of TDR sensors during these manpower-intensive efforts can sometimes lead to TDR sensor miscalibration during re-installation. The inability to effectively clean TDR sensor fouling is a critical point of failure. The buildup of crystallization and other contaminants on TDR rods and tubes creates false readings and electrical shorts, leading to inaccurate fuel measurement and extensive tracking errors. This directly compromises the precise fuel management necessary for the ship's stability and mission readiness. Current ships have had fuel spills due to TDR TLI fouling. Additionally, scheduled maintenance periods to remove and clean fouled TDR TLI units inherently cause time delays and ship-wide disruptions affecting other planned work.. The Navy seeks a product that cleans and potentially reverses the fouling buildup throughout the entire TDR assembly while being compatible with the existing sensor architecture. The technology must return the installed TDR and TLI technique to full operational status upon one execution of the developed technology/technique over an objective period of 36 months, but not less than a threshold period of 8 months of full TDR TLI operability. This effort is required to develop a comprehensive technique that resolves this persistent reliability challenge. A more precise fuel management and reduction in potential failures will result in greater ship stability and increased mission readiness. Phase I: Develop a concept for a product/technology to clean a fouled TDR TLI in-situ, returning it to full operational status within the challenging environment of a compensated fuel tank. Detail how the cleaning technology would be employed on an in-service ship while underway. Establish feasibility through small-scale testing, analysis, or modeling. If the Phase I Option is exercised, include the initial design specifications and capabilities description to build a prototype solution in a Phase II plan. Phase II: Develop, deliver, and demonstrate a prototype of the anti-fouling solution that meets the…

Shortened here. The full text is in the buyer's notice.

Eligibility and award

Funding type
SBIR or STTR

Official notice

The funder's own page for this notice, with its documents and any changes.

Read the funder's notice

All sbir and sttr topics
  1. SEED Company Showcase Participation at Biotech Showcase 2027 for NIH SBIR/STTR Recipients

    NATIONAL INSTITUTES OF HEALTH OLAO (HEALTH AND HUMAN SERVICES, DEPARTMENT OF), MD

    Closes30 Nov 2026

  2. DHS SMALL BUSINESS INNOVATION RESEARCH (SBIR) PROGRAM FY27 PRE-SOLICITATION

    SCI TECH ACQ DIV (HOMELAND SECURITY, DEPARTMENT OF), DC

    Closes7 Dec 2026

  3. DON SBIR/STTR PMO and ONR SBIR/STTR Programs

    OFFICE OF NAVAL RESEARCH (DEPT OF DEFENSE), VA

    Closes7 Dec 2026

  4. Small Business Innovation Research (SBIR) Phase I Subtopic Pre-release

    NASA SHARED SERVICES CENTER (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION)

    Closes7 Dec 2026

  5. Closes7 Dec 2026

  6. Closes16 Dec 2026

  7. Closes16 Dec 2026

  8. Closes16 Dec 2026

Find the next one

This one has closed. Every open grant is listed by kind and by state.

See every open grant