Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems
At a glance
Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems is an SBIR or STTR topic from DOW USAF. Applications closed 25 Nov 2026. It is closed and no longer taking applications. It was posted 7 Oct 2026. The funding number is 27.BZ topic DAF27BZ01-DV011. It is offered as an SBIR or STTR. The funder's notice has the documents and how to apply.
Overview
- Funder
- DOW USAF
- Place
- Not stated
- Type
- SBIR or STTR topic
- Funding number
- 27.BZ topic DAF27BZ01-DV011
- Status
- Closed
Key dates
- Posted
- 7 Oct 2026
- Closes
- 25 Nov 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The funder's description, as posted.
Develop and demonstrate a modular, agile robotic manufacturing workcell capable of autonomously routing, aligning, inserting, and verifying flexible, non-rigid wire harnesses and electrical connectors within the highly constrained physical geometries of Unmanned Aerial Systems (UAS) and advanced munitions. As a Direct-to-Phase-II (D2P2) topic, the immediate goal is to transition a validated proof-of-concept software and mechanical baseline (Technology Readiness Level 4) into fully integrated, operationally viable production workcells evaluated at defense prime contractor manufacturing sites. The system must eliminate the need for hard-tooled, single-product automation by delivering an agile platform that integrates deterministic planning models with real-time, adaptive online sensory feedback. This enables the robot to navigate the unpredictable, non-rigid deformation behaviors of flexible cabling, achieve sub-millimeter positioning tolerances, and safely execute intricate "blind-mate" connection sequences within tight bulkhead quarters without manual intervention. To support a dynamic, high-mix/low-volume defense production environment, the workcell must be designed for rapid retaskability. Offerors must demonstrate a system architecture that allows shop-floor operators to completely retask the workcell to handle an entirely different munitions or UAS harness family within a single eight-hour shift. Furthermore, the platform must establish the first end-to-end digital thread for harness operations, generating machine-readable traceability records for every routing, tensioning, and insertion step to prevent latent defects and ensure 100% military standard compliance. The ultimate phase outcome must demonstrate a two-to-four-times cycle time improvement over legacy manual wiring techniques and a reduction in skilled labor hours per unit by at least 50%. This will directly remove the primary assembly bottleneck constraining the scale-up, surge capacity, and high-rate production of critical defense systems. Context & BackgroundModern Department of Defense (DoD) manufacturing and depot sustainment environments increasingly depend on agile automation to scale up production and maintain rapid operational readiness. While automated assembly technologies have matured substantially for rigid components with predictable geometries, the handling of flexible materials remains a persistent challenge. Specifically, wire harness routing, connector inspection, and insertion operations are ubiquitous across the production lines of Unmanned Aerial Systems (UAS), advanced munitions families, and autonomous collaborative platforms. Currently, these intricate electrical assembly processes represent a bottleneck in UAS assembly operations. Assembly technicians must manually route non-rigid cables through confined structural cavities and execute high-precision connection steps under high-mix, low-volume production conditions. Traditional industrial robotics break down when tasked with these operations because flexible wiring deforms unpredictably during manipulation, completely violating the rigid-part assumptions and fixed, hard-tooled rules of standard automation. Problem, Opportunity, & Unmet Need The complete reliance on manual wire harness installation creates a critical capability deficiency that severely penalizes DoD manufacturing agility and surge capacity. Manual operations are fundamentally non-scalable, meaning production lines cannot dynamically "ramp-to-rate" to meet sudden spikes in theater demand. Furthermore, manual wire routing and insertion introduce human-induced variability, resulting in unquantifiable defects such as partially seated connectors, overstressed wires, or compromised bend radii. These latent defects frequently slip past standard visual inspections and surface as catastrophic electrical or communication failures during critical mission times. Aerospace prime contractors and program offices have identified this…
Shortened here. The full text is in the buyer's notice.
Eligibility and award
- Funding type
- SBIR or STTR
Official notice
The funder's own page for this notice, with its documents and any changes.
Related open funding
Closes30 Nov 2026
Closes7 Dec 2026
Closes7 Dec 2026
Closes7 Dec 2026
Closes7 Dec 2026
Closes16 Dec 2026
Closes16 Dec 2026
Closes16 Dec 2026
Find the next one
This one has closed. Every open grant is listed by kind and by state.