Z2DA--666-27-102 Lightning Protection Update B71N
At a glance
Z2DA--666-27-102 Lightning Protection Update B71N is a federal contract from NETWORK CONTRACT OFFICE 19 (36C259) (VETERANS AFFAIRS, DEPARTMENT OF), in Wyoming. Responses are due 15 Dec 2026. It was posted 23 Nov 2026. The solicitation number is 36C25926Q0880_1. It is set aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14). Its NAICS code is 236220. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- NETWORK CONTRACT OFFICE 19 (36C259) (VETERANS AFFAIRS, DEPARTMENT OF)
- Place
- Wyoming
- Type
- Federal contract
- Solicitation number
- 36C25926Q0880_1
- Status
- Open
Key dates
- Posted
- 23 Nov 2026
- Responses due
- 15 Dec 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
The purpose of this amendment 0001 is as follows: To extend due for proposals from November 27, 2026, to December 15, 2026, before 10:00 AM MT. All offers please email them to Elia L Ruiz Manzo at Elia-Laritza.Ruiz-Manzo@va.gov. To post site visit attendance sheet and agenda. All other items and conditions remain the same. A.1 List of Attachments See attached document: S04-Pre Construction Site Visit attendance. See attached document: S04 - Site Visit Meeting Doc. --------------------------------------------------------- GENERAL: Introduction: An inspection for current code compliance of the lightning Protection System on Building 71N has been conducted and found the system needs upgrades and repairs to meet current NFPA 780 and UL96A standards. The Sheridan VA Medical Center needs the services of a qualified contractor to perform the needed lightning protection upgrades to the main hospital building 71N. Located on the Sheridan Wyoming Veterans Affairs Medical Center (VAMC) campus, at 1898 Fort Road, Sheridan, Wyoming 82801. Statement of Work: Specifics a. Existing Conditions The existing lightning protection system (LPS) for Building 71N was installed in 1989 during the building s original construction. Overall, the system remains in fair condition, though it requires repair because several air terminals have become detached from their adhesive bonds to the roof surface. Air terminals are present at all high points of the structure, and all roof-mounted equipment and appurtenances are properly grounded. A main grounding bus connects the communication systems and possibly the electrical distribution system to the primary service ground. The specific location where the grounding system bonds together the structural steel, electrical system, lightning protection components, and plumbing to create an equipotential ground could not be identified during the assessment. A continuous grounding loop encircles Buildings 9, 71, and 71N, with all roof air terminals and down conductors tied into this loop. Down conductors descend to the loop at the corners of each of these buildings. Each air terminal has at least two separate grounding paths, satisfying current code requirements. No Transient Voltage Surge Suppression (TVSS) devices were observed in the system. The lower 8 feet of the ground down conductors are encased in PVC electrical conduit for protection. New Construction Recent construction has added large equipment and a screen wall to the roof, which now obstructs and interferes with the original positioning of the existing air terminals. This new equipment sits higher than the existing lightning protection system components, rendering the current air terminals ineffective at intercepting and safely directing lightning strikes to ground. Project Requirements To bring the existing lightning protection system (LPS) into compliance the following corrections are needed: Install Transient Voltage Surge Suppression (TVSS) devices at the building s main service panel. Establish proper bonding by interconnecting all electrical systems, communication systems, piping, and structural steel at the service entrance to create an equipotential ground. Repair all roof air terminals that have detached or pulled away from their adhesive mounts on the roof surface. Install new air terminals at both ends of each screen wall, with additional terminals spaced at 20-foot intervals along the top of each wall, and at the highest point of the HVAC ductwork. Install an air terminal at each corner of the new HVAC equipment. Connect all newly installed air terminals to the existing LPS using #2 bare copper conductors. After these corrections have been completed, a qualified inspection is required to verify full compliance with NFPA 780 and UL 96A standards. Upon successful inspection, a Master Label Certificate should be issued for the lightning protection system. General: Construction project is to be completed within 120 calendar days from date of…
Shortened here. The full text is in the buyer's notice.
Requirements
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS code
- 236220
- Product or service code
- Z2DA
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due28 Nov 2026
Due2 Dec 2026
Due2 Dec 2026
Due2 Dec 2026
Due2 Dec 2026
Pursue it in Capveon
Read the documents, check the requirements against your team and draft the response in one place.