Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

UT NP ARCH 100(2) Bridges on Delicate Arch Road

6982AF CENTRAL FEDERAL LANDS DIVISI (TRANSPORTATION, DEPARTMENT OF), Utah. Due 1 Dec 2026.

At a glance

UT NP ARCH 100(2) Bridges on Delicate Arch Road is a federal contract from 6982AF CENTRAL FEDERAL LANDS DIVISI (TRANSPORTATION, DEPARTMENT OF), in Utah. Responses are due 1 Dec 2026. It was posted 17 Nov 2026. The solicitation number is 6982AF27B000005. Its NAICS code is 237310. The buyer's notice has the documents and how to respond.

Overview

Buyer
6982AF CENTRAL FEDERAL LANDS DIVISI (TRANSPORTATION, DEPARTMENT OF)
Place
Utah
Type
Federal contract
Solicitation number
6982AF27B000005
Status
Open

Key dates

Posted
17 Nov 2026
Responses due
1 Dec 2026
Time and time zone
Not stated. Check the buyer's notice.

Summary

The buyer's description, as posted.

PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations. SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100' span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. PRINCIPAL WORK ITEMS: 20420-0000 Embankment Construction: 10,000 CUYD 25101-0300 Placed Riprap, Class 3: 1,725 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,140 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON 55201-0200 Structural Concrete, Class A (AE): 752 CUYD 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR ANTICIPATED SCHEDULE: Advertisement - September 2026 Award - November 2026 NTP - December 2026 Contract Completion - December 2028 ESTIMATED COST RANGE: Total estimated cost between $10,000,000 and $20,000,000 This will be solicited as a full and open competition.

Requirements

NAICS code
237310
Product or service code
Y1LB

Official notice

The buyer's own page for this bid, with its documents and any changes.

Read the buyer's notice

All federal contracts
  1. COMPUTER,AIR DATA; F-16

    DLA AVIATION AT OGDEN, UT (DEPT OF DEFENSE), UT

    Due27 Nov 2026

  2. Process Gases, Hill Air Force Base

    FA8224 OL H PZI PZIM (DEPT OF DEFENSE), UT

    Due30 Nov 2026

  3. Due30 Nov 2026

  4. Oerlikon Metco Thermal Spray Equipment

    FA8227 AFMC OL H PZIMB (DEPT OF DEFENSE), UT

    Due30 Nov 2026

  5. Custodial Services

    W6QM MICC-DUGWAY PROV GRD (DEPT OF DEFENSE), UT

    Due1 Dec 2026

  6. Ross Springs Waterline Replacement

    ASHLEY NATIONAL FOREST (AGRICULTURE, DEPARTMENT OF), UT

    Due1 Dec 2026

  7. Ross Springs Waterline Replacement

    ASHLEY NATIONAL FOREST (AGRICULTURE, DEPARTMENT OF), UT

    Due1 Dec 2026

  8. Due1 Dec 2026

Pursue it in Capveon

Read the documents, check the requirements against your team and draft the response in one place.

Start pursuing thisGet similar opportunities by email