Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA

W075 ENDIST SACRAMENTO (DEPT OF DEFENSE), California. Due 7 Dec 2026.

At a glance

USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA is a federal contract from W075 ENDIST SACRAMENTO (DEPT OF DEFENSE), in California. Responses are due 7 Dec 2026. It was posted 8 Oct 2026. The solicitation number is W9123827X1CHG. Its NAICS code is 237110. The buyer's notice has the documents and how to respond.

Overview

Buyer
W075 ENDIST SACRAMENTO (DEPT OF DEFENSE)
Place
California
Type
Federal contract
Solicitation number
W9123827X1CHG
Status
Open

Key dates

Posted
8 Oct 2026
Responses due
7 Dec 2026
Time and time zone
Not stated. Check the buyer's notice.

Summary

The buyer's description, as posted.

This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of small business firms for a potential Government requirement. NO SOLICITATION IS AVAILABLE; requests for the solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for Design-Bid-Build (DBB) construction services to conduct Copper Cove Wastewater Treatment Plant (CCWTP) Improvements in collaboration with the Calaveras County Water District (CCWD) in Calaveras County, California (CA). The project is anticipated to include installation of a new continuous backwash filtration system to replace an existing filter system; electrical improvements to include upgrading the existing PG&E service size to the main switchboard located in the Control Building, installing a new transformer, raceways, metering panel, new Motor Control Center (MCC), and associated wiring and components; interconnection with a pre-existing CCWD-installed suspended air floatation (SAF) filter pretreatment system; installation of a new continuous backwash filter system to include excavation, shoring, and backfill for a partially buried cast-in-place concrete tank with three (3) equipped filter cells (modules), air control panel, grating and handrailing over the filter cells and feed channel; inlet and outlet piping, valves, and connection to existing ultraviolet (UV) inlet piping; and power and control tie-ins. The project is also anticipated to include construction of a new masonry compressor building on a concrete slab foundation, housing a duplex air compressor with space for an additional unit, along with appurtenant equipment on the compressed air piping including a refrigerated air dryer, oil-water separator, and air filter; a new wet well and submersible pump station to include a new buried precast wet well with an adjacent valve vault housing a duplex submersible pump station, valves and appurtenances, piping, and power control conduits constructed adjacent to the new SAF to convey filter backwash waste flow to the SAF. Finally, the project is anticipated to include demolition and disposal of the existing adsorption clarifier and mixed media filter equipment, dewatering of sludge handling facility solids in three (3) containerized, polymer-assisted gravity sludge dewatering systems that will be positioned on a concrete pad with containment walls and drainage systems to capture drained water and return it to Pond 6 through three (3) quick coupler hose connection points (one (1) per bin), and all associated yard pipe modifications to connect the new components to the existing WWTP, generally buried in suitable native or engineered backfill at depths of approximately three (3) to ten (10) feet of cover. The potential requirement may result in a firm-fixed-price construction solicitation issued approximately December 2026. If solicited, the Government intends to award the anticipated requirement by approximately March 2027. The Government estimates that construction of the anticipated requirement can be completed within three-hundred-sixty-five (365) calendar days from Contractor receipt of the Notice to Proceed. Work may also be impacted by bird nesting season, which runs from 1 February through 31 August. If market conditions indicate the estimated period of performance may be unrealistic, Respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The Government currently estimates the target price range for the anticipated project may be between $5,000,000.00 and $10,000,000.00. The North American Industrial…

Shortened here. The full text is in the buyer's notice.

Requirements

NAICS code
237110
Product or service code
Y1PD

Official notice

The buyer's own page for this bid, with its documents and any changes.

Read the buyer's notice

All federal contracts
  1. Due27 Nov 2026

  2. Healthcare Facility Architect-Engineer (A-E) MATOC – California

    W075 ENDIST LOS ANGELES (DEPT OF DEFENSE), CA

    Due27 Nov 2026

  3. Due27 Nov 2026

  4. FY27 2ND QUARTER SUBSISTENCE BID

    FCC VICTORVILLE (JUSTICE, DEPARTMENT OF), CA

    Due27 Nov 2026

  5. Hoist Blocks, Naval Base San Diego

    NAVSUP FLT LOG CTR SAN DIEGO (DEPT OF DEFENSE), CA

    Due27 Nov 2026

  6. CAVILUX Smart UHS system 650nm, 400w

    NASA SHARED SERVICES CENTER (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION), CA

    Due27 Nov 2026

  7. SR-71 Cultural Resource Management Service

    FA4686 9 CONS PKP (DEPT OF DEFENSE), CA

    Due27 Nov 2026

  8. Retail Space to Lease - Delano, CA

    W075 ENDIST LOS ANGELES (DEPT OF DEFENSE), CA

    Due28 Nov 2026

Pursue it in Capveon

Read the documents, check the requirements against your team and draft the response in one place.

Start pursuing thisGet similar opportunities by email