Open bids in Louisiana
444 open
Soonest due first. Page 6 of 9.
There are 444 open bids in Louisiana listed here now: 188 construction bids, 106 federal contracts and 150 other public bids. The bids on this page are due between 25 Jan 2027 and 10 Mar 2027. Buyers on this page include Louisiana DOTD, W07V ENDIST N ORLEANS (DEPT OF DEFENSE) and NASA MARSHALL SPACE FLIGHT CENTER (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION).
- Amended AFP for Lease of Discovery Park at Michoud Assembly Facility
This Announcement for Proposals (AFP) solicits proposals for lease of Discovery Park which represents a selection of available real property assets at MAF. The real property assets (The Property) known as Discovery Park, and shown in Exhibit A, are as follows: 1. Approximately…
Due25 Jan 2027
- Amended AFP for Lease of Discovery Park at Michoud Assembly Facility
This Announcement for Proposals (AFP) solicits proposals for lease of Discovery Park which represents a selection of available real property assets at MAF. The real property assets (The Property) known as Discovery Park, and shown in Exhibit A, are as follows: 1. Approximately…
Due25 Jan 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277) The work consists of furnishing one fully crewed and equipped cutterhead dredge, with a dredge discharge…
Due3 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275) The work consists of furnishing one fully crewed and equipped cutterhead dredge, with a dredge discharge…
Due3 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278) The work consists of furnishing one fully crewed and equipped cutterhead dredge, with a dredge discharge…
Due3 Feb 2027
Due4 Feb 2027
- Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,
Description and Magnitude of Work is as follows: The work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings. (The estimated time of…
Due5 Feb 2027
- LA 161: LA 2 ALT TO STATE LINE
Type of improvement: ASPHALT SURFACE TREATMENT. Parish: Claiborne. Route: LA 161. Length: 4.25 miles. Estimated cost: $250,000 to $500,000.
Due10 Feb 2027
- US 190: RT TURN LN AT OAK ALLEY BLVD
Type of improvement: WESTBOUND RIGHT TURNLANE ON US 190 ONTO OAK ALLEY BLVD. Parish: St. Tammany. Route: US 190. Length: 0.11 miles. Estimated cost: $250,000 to $500,000.
Due10 Feb 2027
- I-49: SOUTHERN LOOP - MURPHY STREET
Type of improvement: MILL, OVERLAY, CONCRETE PATCHING & REPLACE EXPANSION JOINTS. Parish: Caddo. Route: I-49. Length: 8.54 miles. Estimated cost: $10,000,000 to $15,000,000.
Due10 Feb 2027
- US 61: RWD PAVEMENT MARKINGS
Type of improvement: STRIPING AND PAVEMENT MARKERS. Parishes: East Baton Rouge, East Feliciana, West Feliciana. Route: US 61. Length: 37.74 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- S TANGIPAHOA ROADS - PAV REHAB PHASE 2
Type of improvement: PATCHING IN SOME SPOTS WITH STANDARD MILL & OVERLAY IN OTHER. Parish: Tangipahoa. Length: 6.63 miles. Estimated cost: $5,000,000 to $7,500,000.
Due10 Feb 2027
- RUE DE KAJUN OVER BAYOU PIERRE PART
Type of improvement: BRIDGE REPLACEMENT. Parish: Assumption. Length: 0.02 miles. Estimated cost: $2,500,000 to $5,000,000.
Due10 Feb 2027
- MINOS ROAD OVER COULEE
Type of improvement: BRIDGE REPLACEMENT. Parish: Vermilion. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- I-10: ACADIA PARISH SIGNING
Type of improvement: PERMANENT SIGNING & RELATED WORK. Parish: Acadia. Route: I-10. Length: 27.13 miles. Estimated cost: $2,500,000 to $5,000,000.
Due10 Feb 2027
- LA 445: TURN LANES AT US 190
Type of improvement: MILL, PATCH, OVERLAY, ADD TURN LANE. Parish: Tangipahoa. Route: US 190, LA 445. Length: 0.72 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- LA 160: LA 529 - BODCAU CREEK
Type of improvement: PATCH, MILL, & OVERLAY. Parish: Bossier. Route: LA 160. Length: 3.96 miles. Estimated cost: $5,000,000 to $7,500,000.
Due10 Feb 2027
- DOUCET RD SIDEWALKS
Type of improvement: ADD SIDEWALKS AND STRIPED CROSSWALKS. Parish: Lafayette. Length: 0.89 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- IBERIA ST PAVEMENT PRESERV AND BIKE IMPR
Type of improvement: REHABILITATION OF ROAD SURFACE AND BIKE IMPROVEMENTS. Parish: Iberia. Length: 1.36 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- LA 27: 0.12 MI S RICHARDSON RD - LA 12
Type of improvement: ROAD DIET. Parish: Calcasieu. Route: LA 27. Length: 1.01 miles. Estimated cost: $250,000 to $500,000.
Due10 Feb 2027
- EAST STATE ST OVER CORPORATION CANAL
Type of improvement: BRIDGE REPLACEMENT NO NEW ALIGNMENT. Parish: East Baton Rouge. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- FIRE TOWER ROAD OVER ROCK CREEK
Type of improvement: BRIDGE REPLACEMENT. Parish: Union. Length: 0.02 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- KEPPLER CR ROAD OVER SUGAR CREEK
Type of improvement: BRIDGE REPLACEMENT. Parish: Jackson. Length: 0.01 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- CARNEY ROAD OVER DRAINAGE BAYOU
Type of improvement: BRIDGE REPLACEMENT. Parish: East Baton Rouge. Length: 0.07 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- SAWMILL ROAD OVER CREEK
Type of improvement: BRIDGE REPLACEMENT. Parish: St. Helena. Length: 0.02 miles. Estimated cost: $500,000 to $1,000,000.
Due10 Feb 2027
- CITY OF SHREVEPORT TRAFFIC SIG BKUP
Type of improvement: TRAFFIC SIGNAL POWER GENERATOR INST. Parish: Caddo. Estimated cost: $250,000 to $500,000.
Due10 Feb 2027
- EAST AMES BOULEVARD IMPROVEMENTS
Type of improvement: WIDEN FROM 2 TO 3 LANES. Parish: Jefferson. Estimated cost: $10,000,000 to $15,000,000.
Due10 Feb 2027
- US371: KCS RR OVERPASSES HBI
Type of improvement: BRIDGE REPLACEMENTS/REHABILITATION. Parish: Webster. Route: LA 159, I-20. Length: 1.25 miles. Estimated cost: $15,000,000 to $20,000,000.
Due10 Feb 2027
- NOLA PED SAFETY IMPR - PHASE 2
Type of improvement: PED SIGNALS, CURB RAMPS, STRIPING, SIGNING AND RELATED WORK. Parish: Orleans. Route: US 90, I-910, I-10. Length: 5.2 miles. Estimated cost: $10,000,000 to $15,000,000.
Due10 Feb 2027
- US 51: LEFT TURN LANE SB AT LA 40
Type of improvement: MILL, PATCH, OVERLAY, & PAVEMENT WIDENING. Parish: Tangipahoa. Route: US 51. Length: 0.16 miles. Estimated cost: $500,000 to $1,000,000.
Due10 Feb 2027
- LA 44: MAIN ST - COTTONWOOD ST
Type of improvement: MILL, PATCH, WITH A THIN OVERLAY. Parish: St. John Baptist. Route: LA 44, LA 628. Length: 1 miles. Estimated cost: $250,000 to $500,000.
Due10 Feb 2027
- STREETSCAPE IMPROVEMENTS ON NORTHGATE RD
Type of improvement: CONSTRUCT 10,200 FT. OF PCC SIDEWALK & STREETSCAPING. Parish: Bossier. Length: 1.17 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Feb 2027
- I-55: KENTWOOD NB STATIC SCALE REHAB
Type of improvement: REHAB OF STATIC PIT SCALE. Parish: Tangipahoa. Route: I-55. Length: 0.18 miles. Estimated cost: $500,000 to $1,000,000.
Due11 Feb 2027
- Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025
MISSISSIPPI RIVER, NEW ORLEANS HARBOR AND VARIOUS BAR CHANNELS CUTTERHEAD DREDGE NO. 5-2025. SPECIFICATION NOS. OM25034 PROJECT LOCATION: NEW ORLEANS MAGNITUDE OF CONSTRUCTION: BETWEEN $10,000,000 AND $25,000,000.00. DESCRIPTION OF WORK FOR NOS. 3 THROUGH 6-2025 IS AS FOLLOWS…
Due28 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 1-2025 (OM25001)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 1-2025 (OM25001) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
- Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM25011)
Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract # 11-2025 (OM25011) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 10-2025 (OM25010)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 10-2025 (OM25010) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 9-2025 (OM25009)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 9-2025 (OM25009) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 6-2025 (OM25006)
M ississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 6-2025 (OM25006) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 5-2025 (OM25005) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 4-2025 (OM25004) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 2-2025 (OM25002)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 2-2025 (OM25002) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 3-2025 (OM25003)
Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 3-2025 (OM25003) The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge. Work will be performed in Mississippi River Southwest…
Due28 Feb 2027
Due28 Feb 2027
- LA 48: KENNER LEVEE TRAILHEAD EXPANSION
Type of improvement: SIDEWALKS, BICYCLE FACILITIES, LANDSCAPING AND BUS SHELTERS. Parish: Jefferson. Route: LA 48. Length: 0.06 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Mar 2027
- BARGE 305-070 DRYDOCK FOR REPAIRS (FY27)
Type of improvement: DRYDOCK FOR EXAM AND OTHER MAINTENANCE & REPAIRS. Parish: Statewide. Estimated cost: $250,000 to $500,000.
Due10 Mar 2027
- STONEY POINT BURCH OVER DRAINAGE BAYOU
Type of improvement: BRIDGE REPLACEMENT. Parish: East Baton Rouge. Length: 0.02 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Mar 2027
- ANDREW HIGGINS: MAGAZINE TO CONVENTION
Type of improvement: ROADWAY REHABILITATION, SIDEWALK AND LIGHTING IMPROVEMENTS. Parish: Orleans. Length: 0.45 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Mar 2027
- LA 22: TURN LANE AT LEE'S LANDING
Type of improvement: LEFT TURNLANE WESTBOUND ON LA 22 AT LEE'S LANDING. Parish: Tangipahoa. Route: LA 22. Length: 0.34 miles. Estimated cost: $1,000,000 to $2,500,000.
Due10 Mar 2027
Questions, answered
Something else? Talk to us
How many public bids are open in Louisiana?
There are 444 open bids in Louisiana listed here now: 188 construction bids, 106 federal contracts and 150 other public bids.
How do I bid on government contracts in Louisiana?
Choose a bid on this page and open the buyer's notice. Register as a vendor with that agency if it asks, then submit by the due date, time and method the notice states. A federal contract performed in Louisiana also needs an active SAM.gov registration.
Are grants for Louisiana listed here?
No. Grants and other funding that name Louisiana are listed at https://capveon.ai/grants/us/louisiana.
How current are these listings?
The lists are rebuilt every 15 minutes, and a bid leaves the open list once its due date passes. Confirm the due date, the time and any addenda in the buyer's notice before you submit.