Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Rio De Flag - Phase 4 Construction

W075 ENDIST LOS ANGELES (DEPT OF DEFENSE), US. Due 11 Feb 2027.

At a glance

Rio De Flag - Phase 4 Construction is a federal contract from W075 ENDIST LOS ANGELES (DEPT OF DEFENSE), in US. Responses are due 11 Feb 2027. It was posted 19 Nov 2026. The solicitation number is W912PL27BA001. Its NAICS code is 237990. The buyer's notice has the documents and how to respond.

Overview

Buyer
W075 ENDIST LOS ANGELES (DEPT OF DEFENSE)
Place
US
Type
Federal contract
Solicitation number
W912PL27BA001
Status
Open

Key dates

Posted
19 Nov 2026
Responses due
11 Feb 2027
Time and time zone
Not stated. Check the buyer's notice.

Summary

The buyer's description, as posted.

SOLICITATION W912PL27BA001: RIO DE FLAG FLOOD CONTROL PROJECT - PHASE 4 CONSTRUCTION (LOWER RDF INLET) PRODUCT SERVICE CODE (PSC): Y1KB - CONSTRUCTION OF CANALSISSUING ACTIVITY: U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) 1. GENERAL PROCUREMENT OVERVIEW: The U.S. Army Corps of Engineers, Los Angeles District, is issuing this Invitation for Bids (IFB) to award a single, Firm-Fixed-Price (FFP) construction contract for Phase 4 (Lower RDF Inlet) of the Rio De Flag Flood Control Project in Flagstaff, Coconino County, Arizona.- Procurement Type: Invitation for Bids (IFB) conducted pursuant to FAR Part 14 and FAR Part 36 (Sealed Bidding).- Competition: Unrestricted / Full and Open Competition.- Mandatory Classification Code (PSC): Y1KB - Construction of Canals.- NAICS Code: 237990 - Other Heavy and Civil Engineering Construction (Small Business Size Standard: $45.0 Million).- Estimated Construction Magnitude: Between $35,000,000.00 and $50,000,000.00 (FAR 36.204).- Period of Performance: 1,095 calendar days from issuance of Notice to Proceed (NTP), which includes anticipated seasonal winter shutdowns during December and January.- Solicitation Release Date: On or about 4 December 2026.- Public Virtual Bid Opening: On or about 11 February 2027. 2. DETAILED PROJECT SCOPE AND ENGINEERING FEATURES: The Rio De Flag Flood Control Project is a vital flood risk management initiative in partnership with the City of Flagstaff (Non-Federal Sponsor) designed to manage and convey 100-year (1 percent Annual Exceedance Probability [AEP]) flood discharges from Upper Rio De Flag and Clay Avenue Wash through downtown Flagstaff into the Lower Rio De Flag channel. Phase 4 involves heavy civil, structural, and environmental construction in a dense, historic urban and active railroad corridor. Major components include:- Flood Conveyance Infrastructure: Construction across an adjusted alignment limit of approximately 4,950.58 linear feet (LF), featuring: -- 1,995 LF of Reinforced Concrete Box (RCB) culverts (single and multiple-barrel sections). -- 2,555.08 LF of riprap-lined earthen trapezoidal channel (9-inch and 21-inch stone revetment). -- 200 LF of grouted stone channel, 100.5 LF of reinforced concrete transition structures, and 100 LF of rectangular concrete channel. -- Concrete wingwalls, drop inlets, junction structures, side drainage connections (18-inch to 60-inch RCP), and outlet headwalls.- Earthwork and Controlled Rock Blasting: Mass soil excavation (approx. 85,000 plus CY), soft rock excavation (approx. 27,000 plus CY), and hard basalt rock excavation (approx. 21,000 plus CY). Hard rock excavation requires precision line drilling, specialized shoring, and controlled blasting under stringent vibration thresholds.- Active Railway Corridor Coordination: Culvert construction occurs within 15 feet of active Burlington Northern Santa Fe (BNSF) Railway mainline tracks and historic downtown structures. Real-time automated geotechnical monitoring (vibration/PPV, tiltmeters, ground settlement, inclinometers, and piezometers) and strict compliance with a mandatory BNSF License Agreement are required. Work also includes relocation of the San Francisco Street BNSF signal bungalow.- Environmental Remediation: Excavation, testing, handling, and off-site disposal of petroleum-contaminated soils, and decommissioning/removal of underground storage tanks (USTs) in historic downtown locations (including former Paramount, Fuel Bunkers, Creosote, and 5 Points sites).- Civil and Utility Support: Surface water diversion and control, complex groundwater dewatering (water tables 5 to 20 feet below pre-excavation surface), extensive City of Flagstaff utility relocations (water, sanitary sewer, storm drainage), street restoration, traffic control, security fencing, automated irrigation systems, exterior plantings, and a mandatory 12-month plant establishment period. 3. SUMMARY OF IFB / SEALED BIDDING PROCEDURES:- Unit Price CLIN Schedule: Bids…

Shortened here. The full text is in the buyer's notice.

Requirements

NAICS code
237990
Product or service code
Y1KB

Official notice

The buyer's own page for this bid, with its documents and any changes.

Read the buyer's notice

All federal contracts
  1. DRAWER,ELECTRICAL E

    SPRMM1 DLA MECHANICSBURG (DEPT OF DEFENSE)

    Due27 Nov 2026

  2. 58--BEACON XMTR ASSY,AI, IN REPAIR/MODIFICATION OF

    NAVSUP WEAPON SYSTEMS SUPPORT (DEPT OF DEFENSE)

    Due27 Nov 2026

  3. 58--BEACON RCVR ASSY,AI, IN REPAIR/MODIFICATION OF

    NAVSUP WEAPON SYSTEMS SUPPORT (DEPT OF DEFENSE)

    Due27 Nov 2026

  4. 62--CONTROL,ELECTRIC LI, IN REPAIR/MODIFICATION OF

    NAVSUP WEAPON SYSTEMS SUPPORT (DEPT OF DEFENSE)

    Due27 Nov 2026

  5. 16--STORES MANAGEMENT C, IN REPAIR/MODIFICATION OF

    NAVSUP WEAPON SYSTEMS SUPPORT (DEPT OF DEFENSE)

    Due27 Nov 2026

  6. 16--STORES MANAGEMENT C, IN REPAIR/MODIFICATION OF

    NAVSUP WEAPON SYSTEMS SUPPORT (DEPT OF DEFENSE)

    Due27 Nov 2026

  7. 59--SSE,AIRCRAFT,MATERI, IN REPAIR/MODIFICATION OF

    NAVSUP WEAPON SYSTEMS SUPPORT (DEPT OF DEFENSE)

    Due27 Nov 2026

  8. Due27 Nov 2026

Pursue it in Capveon

Read the documents, check the requirements against your team and draft the response in one place.

Start pursuing thisGet similar opportunities by email