Replacement of roof at Moorwell Waste Management Facility
At a glance
Replacement of roof at Moorwell Waste Management Facility is a construction bid from Council of the Isles of Scilly, in ENG. Responses are due 28 Feb 2027. The solicitation number is CIOS-WASTE-2026-ROOF. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- Council of the Isles of Scilly
- Place
- ENG
- Type
- Construction bid
- Solicitation number
- CIOS-WASTE-2026-ROOF
- Status
- Open
Key dates
- Posted
- Not stated
- Responses due
- 28 Feb 2027
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
Category: works. The Council of the Isles of Scilly intends to procure a contractor to undertake the replacement of the existing roof covering to the Waste Processing Hall at the Moorwell Waste Management Facility, St Mary's, Isles of Scilly. The project will involve the design (where required), supply, delivery and installation of a replacement roofing system incorporating fibre cement roofing sheets and associated roof components. The replacement roof shall be designed and constructed to: • Provide a durable weatherproof roof covering suitable for a marine environment. • Achieve a minimum design life of 30 years. • Incorporate fibre cement roof sheets and associated flashings, fixings and accessories. • Be structurally capable of supporting a roof-mounted solar photovoltaic (PV) installation. • Include adequate load-bearing capacity for maintenance personnel and safe access equipment. • Incorporate compliant fall-protection measures and roof access arrangements. • Meet all relevant Building Regulations and Health and Safety requirements. • Minimise disruption to the ongoing operation of the waste management facility. Roof works and other special trade construction works
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due2 Dec 2026
Due2 Dec 2026
Due2 Dec 2026
Pursue it in Capveon
Read the documents, check the requirements against your team and draft the response in one place.