Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Replacement of roof at Moorwell Waste Management Facility

Council of the Isles of Scilly, ENG. Due 28 Feb 2027.

At a glance

Replacement of roof at Moorwell Waste Management Facility is a construction bid from Council of the Isles of Scilly, in ENG. Responses are due 28 Feb 2027. The solicitation number is CIOS-WASTE-2026-ROOF. The buyer's notice has the documents and how to respond.

Overview

Buyer
Council of the Isles of Scilly
Place
ENG
Type
Construction bid
Solicitation number
CIOS-WASTE-2026-ROOF
Status
Open

Key dates

Posted
Not stated
Responses due
28 Feb 2027
Time and time zone
Not stated. Check the buyer's notice.

Summary

The buyer's description, as posted.

Category: works. The Council of the Isles of Scilly intends to procure a contractor to undertake the replacement of the existing roof covering to the Waste Processing Hall at the Moorwell Waste Management Facility, St Mary's, Isles of Scilly. The project will involve the design (where required), supply, delivery and installation of a replacement roofing system incorporating fibre cement roofing sheets and associated roof components. The replacement roof shall be designed and constructed to: • Provide a durable weatherproof roof covering suitable for a marine environment. • Achieve a minimum design life of 30 years. • Incorporate fibre cement roof sheets and associated flashings, fixings and accessories. • Be structurally capable of supporting a roof-mounted solar photovoltaic (PV) installation. • Include adequate load-bearing capacity for maintenance personnel and safe access equipment. • Incorporate compliant fall-protection measures and roof access arrangements. • Meet all relevant Building Regulations and Health and Safety requirements. • Minimise disruption to the ongoing operation of the waste management facility. Roof works and other special trade construction works

Official notice

The buyer's own page for this bid, with its documents and any changes.

Read the buyer's notice

Pursue it in Capveon

Read the documents, check the requirements against your team and draft the response in one place.

Start pursuing thisGet similar opportunities by email