PRO005166 - ORiW - Design and Integration Partner
At a glance
PRO005166 - ORiW - Design and Integration Partner is an other public bid from United Utilities Water Limited, in ENG. Responses are due 30 Nov 2026. The solicitation number is PRO005166. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- United Utilities Water Limited
- Place
- ENG
- Type
- Bid
- Solicitation number
- PRO005166
- Status
- Open
Key dates
- Posted
- Not stated
- Responses due
- 30 Nov 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
Category: services. This notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms and chemicals. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. This Scope of Requirements does not include agricultural impacts; these are being considered by other programmes. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a ‘feasibility study’ to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams; • First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it. • First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented. • Reduced weather dependent flow, surface water management and management and treatment of highways runoff through the use of nature- based solutions where possible across the catchment. • Construction of tunnel, sewers, rising mains and associated infrastructure. • Upgrade of an existing wastewater treatment works and discharge point. UU anticipates that the ORiW system and the other strategic wastewater transfer and treatment infrastructure required for the ORiW programme (including the tunnel, rising mains, pumping stations, wastewater treatment facilities, associated drainage works and all ancillary infrastructure), will be promoted through a Development Consent Order (DCO) as a Nationally Significant Infrastructure Project (NSIP), subject to Section 35 approval by Defra. [SM1.1][WD1.2] UU are launching a competitive tendering procedure for the appointment of a Design and Integration Partner (D&IP) who will be responsible for supporting the next phase of this programme, designing the ORiW system, including whole system integration, to achieve the programme vision. UU requires the D&IP to complete feasibility, outline design, constructability and other related activities to obtain the necessary approvals and consents for the programme to proceed to the delivery phase for the preferred solution. Accordingly, the D&IP will also be responsible for the delivery of the DCO and planning approvals. As such, the outline design needs to fully support and integrate with the DCO, Town and Country Planning Act (TCPA) and land acquisition and access processes. At a high level, the initial scope of requirements for the D&IP will include, but may not be limited to the following activities across each of the workstreams of the ORiW system; • Outline Design • Planning, Consents and Land • Environmental Impact Assessments (EIA) and surveys • Stakeholder and Customer Engagement • Land Agency, Referencing and Surveying • Preparation and submission of planning applications and all…
Shortened here. The full text is in the buyer's notice.
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Pursue it in Capveon
Read the documents, check the requirements against your team and draft the response in one place.