New Mexico Forest Engineering and Road Maintenance (FERM)
At a glance
New Mexico Forest Engineering and Road Maintenance (FERM) is a federal contract from USDA-FS, STEWARDSHIP CONTRACTING BRANCH (AGRICULTURE, DEPARTMENT OF), in New Mexico. Responses are due 1 Feb 2028. It was posted 15 Jan 2026. The solicitation number is 12363N22Q4000. It is set aside: Total Small Business Set-Aside (FAR 19.5). Its NAICS code is 237310. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- USDA-FS, STEWARDSHIP CONTRACTING BRANCH (AGRICULTURE, DEPARTMENT OF)
- Place
- New Mexico
- Type
- Federal contract
- Solicitation number
- 12363N22Q4000
- Status
- Open
Key dates
- Posted
- 15 Jan 2026
- Responses due
- 1 Feb 2028
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
Current Award Information posted 2/13/2023. See Attachment. Solicitation is open continous and award information will be updated as needed. Amendment 1- 11/17/2022 See attachments for details (Amendment 01, Revised NM FERM Quote Package, and E_PSR-REVIE_C-GROUP 3 G3-4 EARTHEN BARRIER G3-4 (1). No extension to due date. Update to posting 2/5/242-Updated BPA contact information. No other changes. New Mexico Forest Engineering and Road Maintenance (FERM). This solicitation is for road maintenance and construction work to be performed within the New Mexico National Forest area composed of the Carson, Cibola, Gila, Lincoln, Santa Fe, and Kiowa Forests. This solicitation and any resultant Blanket Purchase Agreements may incorporate service, construction, emergency work, and potential for other complex work requirements. See Attachments for more information.
Requirements
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS code
- 237310
- Product or service code
- Y1LB
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Pursue it in Capveon
Read the documents, check the requirements against your team and draft the response in one place.