NASA-WHITE SANDS SCRAP METAL REMOVAL TERM CONTRACT
At a glance
NASA-WHITE SANDS SCRAP METAL REMOVAL TERM CONTRACT is a federal contract from GSA/FAS/GSS/QSCA, MULTIPLE AWARD SCHEDULE CONTRACTING DIVISION (GENERAL SERVICES ADMINISTRATION), in New Mexico. Responses are due 21 Dec 2026. It was posted 20 Nov 2026. The solicitation number is 3-1-QSC-T-27-002. Its NAICS code is 423930. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- GSA/FAS/GSS/QSCA, MULTIPLE AWARD SCHEDULE CONTRACTING DIVISION (GENERAL SERVICES ADMINISTRATION)
- Place
- New Mexico
- Type
- Federal contract
- Solicitation number
- 3-1-QSC-T-27-002
- Status
- Open
Key dates
- Posted
- 20 Nov 2026
- Responses due
- 21 Dec 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
This auction requires the high bidder to submit completed and signed certification(s) found in the "Documents" section and/or proof of licensing to the Sales Contracting Officer before the award is finalized. Requirements vary by auction. NASA-WHITE SANDS SCRAP METAL REMOVAL TERM CONTRACT GSA Auctions Link: https://www.gsaauctions.gov/auctions/preview/384008 IFB: 3-1-QSC-T-27-002 Location: National Aeronautics and Space Administration (NASA) - White Sands Test Facility, 12600 NASA Road, MS RC, Las Cruces, NM 88012. The U.S. General Services Administration (GSA) is soliciting sealed bids for the purchase, onsite processing, and removal of Government-owned DEMIL A Mixed Metals Scrap at (NASA) - White Sands Test Facility. PROPERTY DESCRIPTION: Estimated Quantity: Approximately 129 gross tons (290,000 pounds) of DEMIL A Mixed Metals Scrap. Property may include heavy, structural steel, Oversize metal, steel assemblies and pipe. Moreover, metals may include flanges, metal tanks, machinery components, aluminum electrical wire with metals, mixed ferrous and non-Ferrous Scrap. The Contractor shall provide all labor, equipment, supplies, containers, transportation, and other resources necessary to support the Government's scrap metal accumulation and removal requirements throughout the contract period. The Government will not furnish equipment, supplies, or labor for removal activities. The Contractor shall provide, service, replace, and remove containers, or perform direct scrap metal removal, as requested by the AGR and approved for use at the site. Requests may be made verbally, by telephone, or by email; however, email confirmation from the AGR shall serve as the official record for determining compliance with required response times. The Contractor shall maintain two 30-yard roll-off containers at the facility at all times for scrap metal accumulation. When a container becomes full, the Contractor shall remove and replace it with an empty 30-yard roll-off container within the required response time, unless otherwise coordinated and approved by the Government. The Contractor shall also be capable of supporting surge requirements associated with demolition projects or other increased scrap generation. During surge periods, the Contractor may be required to provide and service up to four additional 30-yard roll-off containers, in addition to the two 30-yard roll-off containers maintained at the facility. The Contractor shall meet the following response requirements: Container Delivery: Deliver requested containers within two business days after notification from the AGR. Container Removal/Replacement: Remove full or requested containers and replace them, as required, within two business days after notification from the AGR. Direct Removal: When container-based removal is not required, perform pickup, loading, transportation preparation, and removal within two business days after notification from the AGR, unless otherwise coordinated and approved by the Government. The Contractor must be capable of supporting routine, surge, and specialized removal requirements, including maintaining required containers, providing additional containers during surge periods, providing metal drums or other stationary containers as required, and providing crane support approximately one to two times within a 365-day period for removal of larger objects. Appendix C, Container Plan Submission Form (consolidated version), is required to be completed and included with the sealed bid documents. All removal activities shall be coordinated in advance with the AGR. Unless otherwise approved, removals should be scheduled for completion between 8:00 a.m. and 12:00 p.m. or between 1:00 p.m. and 3:00 p.m., excluding Fridays, Saturdays, Sundays, and holidays. Weighing will be performed using an on-site Government scale. Note: The attached removal history covers the last 24 months of the previous contract. The data was compiled from the monthly invoices and includes…
Shortened here. The full text is in the buyer's notice.
Requirements
- NAICS code
- 423930
- Product or service code
- 9670
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Pursue it in Capveon
Read the documents, check the requirements against your team and draft the response in one place.