Mauldin Road WRRF Wet Weather Pump Station VFD Replacement RFB
At a glance
Mauldin Road WRRF Wet Weather Pump Station VFD Replacement RFB is a construction bid from Renewable Water Resources (ReWa), in South Carolina. Responses are due 2 Dec 2026. It was posted 2 Nov 2026. The solicitation number is 610. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- Renewable Water Resources (ReWa)
- Place
- South Carolina
- Type
- Construction bid
- Solicitation number
- 610
- Status
- Open
Key dates
- Posted
- 2 Nov 2026
- Responses due
- 2 Dec 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
Complete replacement of four (4) existing variable frequency drives rated for 250-HP motors. Where federal funds (FEMA) are utilized, and to the extent applicable, the following federal provisions may apply consistently with Uniform Guidance in 2 C.F.R. § 200.326 and 2 C.F.R. Part 200, and its Appendix II. Relevant federal authorities may require additional provisions depending on the scope and context of the Contract. Failure to meet any of these requirements may result in contract termination.
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due1 Dec 2026
Due1 Dec 2026
Due1 Dec 2026
Due1 Dec 2026
Pursue it in Capveon
Read the documents, check the requirements against your team and draft the response in one place.