Market Intelligence - Richmond ARC - CM at Risk
At a glance
Market Intelligence - Richmond ARC - CM at Risk is a federal contract from W072 ENDIST LOUISVILLE (DEPT OF DEFENSE), in Virginia. Responses were due 2 Oct 2026. It is closed and no longer taking bids. It was posted 24 Sep 2026. The solicitation number is W912QR-CMRISK-RICHMOND-ARC. Its NAICS code is 236220. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- W072 ENDIST LOUISVILLE (DEPT OF DEFENSE)
- Place
- Virginia
- Type
- Federal contract
- Solicitation number
- W912QR-CMRISK-RICHMOND-ARC
- Status
- Closed
Key dates
- Posted
- 24 Sep 2026
- Responses due
- 2 Oct 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
***NOTICE*** Use the link provided under "Submission Instructions" to respond to the questions. Responses submitted any other way will not be accepted. REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm's ability to submit a proposal should formal solicitation be issued in the future. NAICS Code: 236220 - Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the construction of Army Reserve Center (ARC) at DSCR Richmond, VA. The scope of work consists of furnishing all necessary equipment, materials, labor, supervision, quality control, and supplies to deliver a fully functional 300 Member Army Reserve Center, including an Un-Heated Storage (UHS) Building. ARC is estimated at 56,678 SF and the UHS is estimated at 1,217 SF. Estimated Acquisition Magnitude: $30,000,000 - $50,000,000 PLANNED ACQUISITION STRATEGIES UNDER EVALUATION: Construction Management at Risk (CM@Risk) via Other Transaction Authority (OTA). The Louisville District is evaluating a Construction Management at Risk (CM@Risk) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. Section 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. Currently, the Government has advanced the design to 65% and has the capability to progress to a full design. Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing Construction Management at Risk (CM@Risk) utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. Section 2808a. The CM@Risk Course of Action (10 U.S.C. Section 2808a): This path allows USACE to execute a construction project where the Construction Firm is brought in during the design. Based on the current status of the Richmond ARC design effort, the Louisville District anticipates onboarding the CMAR at around 90% completion. Phase 1 Preconstruction: The builder is hired during Phase 1 to act as an expert consultant, helping the Designer of Record (DOR) push the design from 90% to 100% using real-time market data and MII (MCACES 2nd Generation) cost comparisons. Phase 2 Construction: Once the design hits 100% and the MII estimate validates the open-book pricing, the agreement transitions to Phase 2, where the builder goes "At-Risk" to construct the facility under a Guaranteed Maximum Price (GMP). The DOR retains design liability, but the contractor drives constructability and assumes responsibility for layout, schedule, and trade coordination. The CM@Risk Pricing Structure: Preconstruction Services Fee: A small, fixed-price amount paid to the contractor strictly to fund their time spent helping the Architect Engineer (A/E) finalize the 90% design into a 100% design. The Target Fee: The contractor's transparent profit margin for managing the actual construction, bid competitively upfront. The GMP: The…
Shortened here. The full text is in the buyer's notice.
Requirements
- NAICS code
- 236220
- Product or service code
- Y1JZ
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Find the next one
This one has closed. Get the open bids that fit what you sell by email.