Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Lunar Surface Logistics Architecture Study

Canadian Space Agency (CSA), QC. Due 22 Dec 2026.

At a glance

Lunar Surface Logistics Architecture Study is an other public bid from Canadian Space Agency (CSA), in QC. Responses are due 22 Dec 2026. It was posted 26 Nov 2026. The solicitation number is 9F055-20260122.

Overview

Buyer
Canadian Space Agency (CSA)
Place
QC
Type
Bid
Solicitation number
9F055-20260122
Status
Open

Key dates

Posted
26 Nov 2026
Responses due
22 Dec 2026
Time and time zone
Not stated. Check the buyer's notice.

Summary

The buyer's description, as posted.

The architecture study conducted as part of this SOW aims to inform and guide the strategic development of the targeted capability area identified in Section 4.1, necessary to enable a sustainable and resilient presence on the lunar surface. This study must support long-term exploration objectives below by identifying the functional, operational, and technical enablers required for successful human and robotic operations on the lunar surface, while also forward-looking beyond exploration of the Moon (e.g., Mars). The objectives of this LSEI Architecture Study are as follows: 1. Landscape Assessment and Strategic Outlook Provide a comprehensive scan of the domain’s current and emerging landscape within the targeted capability area. This includes reviewing applicable technologies, operational approaches, and development strategies, while identifying future needs and potential operating models. Where possible, conduct trade space analysis and evaluation between the various landscape items to determine advantages, disadvantages, and potential risks. The study must offer a clear scenario-based roadmap and outline key strategic pathways forward. 2. Sub-Architecture Specific sub-architecture for LSL must be defined and analyzed in detail. Sub-architecture must identify key system elements with their driving needs, interfaces, operational concepts, performance requirements and constraints, while also showing how it integrates into the broader lunar surface architecture. The objective is to ensure that sub-architectures are both individually robust and collectively interoperable, enabling modular evolution and alignment with the overall roadmap for lunar exploration and sustained operations. 3. Strategic Integration and Interoperability Clarify and map out strategic ties of the capability area to the integrated surface exploration architecture. The analysis must reflect technical feasibility and market interests while including considerations of interoperability, scalability, and alignment with long-term international exploration goals on the lunar surface. 4. Reference Framework for Development Establish a domain-specific reference architecture that informs future mission planning and guides concept definition, technology development, testing, and system-level integration. The reference architecture concept must support sustained human and robotic lunar surface exploration operations. The framework should support sustainable exploration practices and enduring surface operations. The architecture must demonstrate a clear evolution and progression over time from 2026 to 2040, showing how capabilities expand, integrate, and scale to support short-term missions through long-term sustainable lunar operations [RD-04]. This phased approach allows for the gradual expansion and adaptation of systems as technological capabilities and mission requirements mature. 5. Investment Guidance for Enabling Technologies Deliver recommendations for strategic technology investments that address capability gaps, reduce mission risks, and enhance outcomes in the lunar surface logistics sub-architecture. The proposed recommendations should also deliver terrestrial/societal benefits, with an emphasis on those that leverage existing or emerging national strengths. 6. Phased Implementation and Roadmap A key objective of the lunar architecture studies is to define phased implementation pathways that align with mission timelines and stakeholder priorities. The roadmap should illustrate how capabilities grow over time (from early demonstration missions to sustained lunar presence) highlighting critical milestones, decision points, and dependencies. It should also show how international, government, and commercial contributions can be integrated, ensuring interoperability and scalability while reducing technical and programmatic risk.

  1. Re-issue RFP - National Integrated Security System

    Department of Public Works and Government Services (PSPC), QC

    Due27 Nov 2026

  2. W0501-27M023 RISO Boxed Lunches

    Department of Public Works and Government Services (PSPC), QC

    Due27 Nov 2026

  3. 5P424-260001 Mini Excavator

    Department of Public Works and Government Services (PSPC), QC

    Due27 Nov 2026

  4. Weak magnetic anomaly detection for defence and security

    Department of Public Works and Government Services (PSPC), QC

    Due27 Nov 2026

  5. 23445-261032 - DAS Interrogator

    Department of Public Works and Government Services (PSPC), QC

    Due27 Nov 2026

  6. Office Furniture

    Department of the Environment (ECCC ), QC

    Due27 Nov 2026

  7. Due27 Nov 2026

  8. Splunk Support Services

    Department of Employment and Social Development (ESDC), QC

    Due27 Nov 2026

Pursue it in Capveon

Read the documents, check the requirements against your team and draft the response in one place.

Start pursuing thisGet similar opportunities by email