Intent to Sole Source - Type-C A&E Services for Construction of SFS Facility
At a glance
Intent to Sole Source - Type-C A&E Services for Construction of SFS Facility is a federal contract from W7NS USPFO ACTIVITY NCANG 145 (DEPT OF DEFENSE), in North Carolina. Responses are due 27 Nov 2026. It was posted 12 Nov 2026. The solicitation number is W50S87-27-C-A001. Its NAICS code is 541330. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- W7NS USPFO ACTIVITY NCANG 145 (DEPT OF DEFENSE)
- Place
- North Carolina
- Type
- Federal contract
- Solicitation number
- W50S87-27-C-A001
- Status
- Open
Key dates
- Posted
- 12 Nov 2026
- Responses due
- 27 Nov 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
The 145th Mission Support Group Contracting office in Charlotte, NC intends to issue a written request for proposal and resulting firm-fixed price sole source award to AECOM. This sole source award will be for Type "C" services for construction contract administration for the Construction of the Security Forces Building project. Type "C" services include but are not limited to documenting and providing answers to contractor's requests for information, submittal reviews, attendance and records at progress meetings, review of lab results, preparation of as-built drawings, and multiple site visits to inspect the building during construction. This requirement is a follow-on award to AECOM. The requirement was previously negotiated and awarded via task order W50S87-21-F-5013. That award included Type A and B services for the design of the Construction of the Security Forces Building project. Type A services included the basis of design (specifically the design intent), the development of the project concept, and associated site investigations. The Type B services included the design narrative and the development of the construction documents. Because AECOM designed and certified the drawings and specifications and is liable for the quality of their design, it is economical and efficient to award the Type C services as a sole source follow-on contract. There is tremendous performance and liability risk associated with another A-E firm taking over the Type C services for a project that was designed by a different firm. Having the original designer, AECOM, on contract to perform the construction phase services is necessary for the Government to ensure responsibility for their design, including ensuring the design is constructible, maintainable and operable, that the project documentation is clear, sufficiently detailed, accurate and coordinated, and contains minimal errors. An award to a new A-E other than AECOM would increase the risk associated with these issues and potentially affect the Government's rights under FAR 52.236-23, Responsibility of the Architect-Engineer Contractor, if another A-E were to represent or attempt to revise the current drawings and/or specifications. This clause states that the "Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, and other services furnished by the Contractor". However, if a new A-E were to make recommendations during the Type C services to revise or deviate from the original drawings or specifications, any liability resulting from those changes could not be attributed to the original A-E. This could potentially create a dangerous and complicated scenario if the Government needed to hold the responsible A-E party liable for any errors or deficiencies in the designs, drawings, and/or specifications. This action is being taken using the authority of 10 U.S.C. 2304(c)(1), as implemented by RFO 6.103-1, Only one responsible source and no other supplies or services will satisfy agency requirements.
Requirements
- NAICS code
- 541330
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due28 Nov 2026
Pursue it in Capveon
Read the documents, check the requirements against your team and draft the response in one place.