HAR6112 Cressy Place Construction
At a glance
HAR6112 Cressy Place Construction is a construction bid from Tower Hamlets, in ENG. Responses are due 3 Feb 2027. The solicitation number is HAR6112. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- Tower Hamlets
- Place
- ENG
- Type
- Construction bid
- Solicitation number
- HAR6112
- Status
- Open
Key dates
- Posted
- Not stated
- Responses due
- 3 Feb 2027
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
Category: works. The Authority is seeking a Contractor to deliver the redevelopment of the Stifford Community Centre site and adjoining former garages site at Cressy Place, Stepney Green. The project will deliver 31 new affordable homes for rent in two blocks, a replacement community centre, shared open space, landscaping, and associated external and highways works. The new homes will be wholly owned and managed by the Council The former garage area has already been demolished and hoarded. The existing Stifford Community Centre remains on site and is to be demolished. Site Conditions & Project Abnormals: Please note this list is informative, not exhaustive and in no particular order; it has been included to assist bidders at the early stages of the ITT process: • The Site sits above a TfL tunnel (Elizabeth Line) – no piling allowed; it is understood that a raft slab has been proposed. • Latest UXO Survey cites ‘High Risk’. • Island site – a site visit is recommended. • No asbestos surveys have been undertaken to date, so Bidders are to include for an R&D Asbestos Survey in their bid. Any required removal of ACMs is to be covered by the Provisional Sum provided. • A gas main diversion is required – see folder 15 Utilities – Cadent Quote - (requote required). This project is subject to GLA funding and therefore must start on site prior to 31/03/2027 Publishable KPIs under the contract will be as set out in the ITT: Quality - Works defects: Number of defects recorded on Employer inspections during the quarter. • Rules: unique defects; repeats counted; excludes agreed Employer changes/variations. • Evidence: inspection reports and defect log. • Verified by: Employer's Rep / Clerk of Works. Programme - Slippage (weeks): Difference between Contract Completion Date and completion date in latest Employer-accepted programme, excluding approved EoT. • Rules: where EoT is pending, measure against last agreed completion date. • Evidence: accepted programme and EoT register. • Verified by: Employer PM / Employer's Rep. Health and Safety incidents: Number of reportable incidents during the quarter (non-RIDDOR and RIDDOR-reportable). • Rules: classify using HSE RIDDOR criteria; near-misses are reported separately for learning. • Evidence: accident book, incident reports and (where applicable) RIDDOR submission reference. • Verified by: Employer H&S lead / Employer's Rep. Construction work
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due2 Dec 2026
Due2 Dec 2026
Due2 Dec 2026
Pursue it in Capveon
Read the documents, check the requirements against your team and draft the response in one place.