Galveston HVAC Repair/Replacement
At a glance
Galveston HVAC Repair/Replacement is a federal contract from DEPT OF COMMERCE NOAA (COMMERCE, DEPARTMENT OF), in Texas. Responses were due 16 Sep 2026. It is closed and no longer taking bids. It was posted 10 Sep 2026. The solicitation number is 1333MF26Q0110. It is set aside: Total Small Business Set-Aside (FAR 19.5). Its NAICS code is 238220. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- DEPT OF COMMERCE NOAA (COMMERCE, DEPARTMENT OF)
- Place
- Texas
- Type
- Federal contract
- Solicitation number
- 1333MF26Q0110
- Status
- Closed
Key dates
- Posted
- 10 Sep 2026
- Responses due
- 16 Sep 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
The purpose of this amendment 0001 is to clarify CAR 1352.246-70, as well as provide an updated revised SOW and respond to the questions received for Solicitation No. 1333MF26Q0110. Combined Synopsis Solicitation: 1333MF26Q0110 CAR 1352.246-70 final inspection and acceptance will occur at the NOAA Galveston facility An updated Revised Statement of Work is included in this amendment 0001 as an attachment to the amended solicitation. Revisions are clearly identified in "red font". Response to Questions: Q&A #1 Solicitation_1333MF26Q0110_FD-26-517 (Galveston HVAC repairs/Replacements) All questions were due from vendors by 10am EST 9/10 Q1-Please confirm the required nominal capacity for the three Mitsubishi PKA-A30KA6 replacements. The SOW describes these as 2-ton systems, while the model designation appears to indicate a different nominal capacity. A1 - There are two (2) 2 1/2 ton and one (1) 2 ton machines in the Turtle Hospital. Clarified in more detail for question 14. Q2-Please provide the required capacity of each indoor head serving the new 3-ton dual-head system in the Turtle Barn Aquaculture Area. A2- should be a (2) two ton unit with each head being a one (1) ton unit Q3-Please confirm the voltage, phase, available breaker capacity, and whether the existing electrical circuits may be reused. A3 - Existing circuits will be reused. The new breaker for the turtle barn will be added by NOAA, it will be a 208volt Q4-Please clarify whether the base-year CLIN must include all four quarterly preventive-maintenance visits in addition to the five-system installation. A4 - Yes, base year must include quarterly preventive maintenance. Q5-Please confirm the correct option-year CLIN numbering. The solicitation identifies the option CLINs as 0002-0005 in one section and 1001-4001 in another. A5) Option CLINS will either be 0002-0005 or 1001-4001, no final decision has been made Q6-Please identify the acceptable coastal-corrosion coating standards, approved products, and required manufacturer or warranty documentation. A6 - Both the interior and exterior units must have appropriate coastal coating to meet the Galveston Climate and proximity to the ocean/sea air. Q7-Please confirm that final inspection and acceptance will occur at the NOAA Galveston facility. CAR 1352.246-70 currently identifies the NMFS Miami campus as the place of acceptance. A7) Final inspection will occur at the Galveston Facility Q8-Please provide any site-visit measurements, photographs, attendance notes, or other information available to prospective offerors who could not attend the scheduled walkthrough. A8) All Q&A from the site visit is located within this Q&A document and Amendment to the solicitation Q9-Please clarify whether NOAA will issue tax-exempt purchasing documentation for materials incorporated into the project. A9) The Federal government does not pay taxes, however we can not dictate state and local tax requirements on vendors. NOAA will not be issuing tax exempt purchasing documentation for material purchasing, however the contract itself will be tax exempt as the Federal Government does not pay taxes. Q10-Please confirm whether monthly-equivalent pricing is required only for preventive-maintenance services or also for the one-time installation under the base CLIN. A10 - Monthly pricing is not needed for the base one time installation, that should be FFP. Q11-Would the facility like the option, on the mini split systems, to turn the heat on during the winter months, or would like the systems to be cool only? A11 - Yes, all units installed will be dual use (Cooling and Heating) as they currently are. Q12-Is there a particular brand of choice for the systems? would they like direct replacements or will a different brand work like Daikin Systems? A12: The government is relying on proposals to recommend the best solution to meet the requirements as outlined in the solicitation, statement of work and Q&A. Q13-Would the facility be ok with swapping…
Shortened here. The full text is in the buyer's notice.
Requirements
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS code
- 238220
- Product or service code
- J041
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Find the next one
This one has closed. Get the open bids that fit what you sell by email.