C-17 Globemaster III Modular Approach Shoring System & Companion Flight Certified Tactical Shipping Containers
At a glance
C-17 Globemaster III Modular Approach Shoring System & Companion Flight Certified Tactical Shipping Containers is a federal contract from FA6712 911 AW LGC (DEPT OF DEFENSE), in Pennsylvania. Responses are due 9 Dec 2026. It was posted 23 Nov 2026. The solicitation number is FA671227SS001. It is set aside: Total Small Business Set-Aside (FAR 19.5). Its NAICS code is 332312. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- FA6712 911 AW LGC (DEPT OF DEFENSE)
- Place
- Pennsylvania
- Type
- Federal contract
- Solicitation number
- FA671227SS001
- Status
- Open
Key dates
- Posted
- 23 Nov 2026
- Responses due
- 9 Dec 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
1. PURPOSE & OPERATIONAL SCOPE The 911th Airlift Wing is conducting market research under FAR Part 10 to identify qualified commercial manufacturers and authorized suppliers capable of providing a reusable, modular, non-wood aircraft approach shoring system and companion flight-certified tactical storage containers engineered specifically for C-17 Globemaster III flight and cargo operations. Mission Need: Loading heavy tracked/wheeled vehicles and low-clearance trailers into the C-17 cargo compartment requires approach shoring to reduce the ramp crest angle and protect ramp toes. The wing is replacing legacy dimensional lumber wedges to: Eliminate Weight & Cube: Eliminate thousands of pounds of deadweight wood consuming payload and pallet space Ensure Phytosanitary Compliance: Eliminate dimensional lumber subject to international border quarantine (ISPM-15 and DoD Manual 4140.65-M) Prevent Flightline FOD: Eliminate splintering lumber, loose nails, and banding hazards adjacent to C-17 turbofan engines Accelerate Turnaround: Achieve full ground setup in under 15 minutes without specialized heavy equipment This announcement is for market research and acquisition planning purposes only. It does not constitute a Request for Proposals (RFP) or an Invitation for Bids (IFB). No contract will be awarded directly from this notice and the Government will not pay for any information submitted. 2. DRAFT SALIENT TECHNICAL CHARACTERISTICS Prospective commercial solutions must meet or exceed the following performance and physical parameters: Part A: Modular Approach Shoring System (Brand Name or Equal to DAMAS 26K) Air Transportability Certification (MANDATORY GATE): Quoted system must possess an active, written air transportability and cargo loading certification letter issued by AFLCMC/EZFC ATTLA (Air Transportability Test Loading Activity) authorizing internal flight carriage and roll-on/roll-off loading operations on C-17 aircraft (equivalent to ATTLA Memo # 2012.02.06.02 Rev 1) Because immediate operational availability is required, developmental systems requiring unperformed AFLCMC flight tests will not be considered Axle Load Ratings & Safety Factor: Single axle load rating: Minimum 26,000 lbs per axle Multi-axle rating (spaced > 48 inches): Minimum 20,000 lbs/axle (40,000 lbs tandem total) Multi-axle rating (spaced < or equal to 48 inches): Minimum 26,000 lbs combined axle loading Structural Safety Factor: Minimum 2:1 structural safety factor (components rated for no more than 50% of structural yield/failure strength) Airframe Floor Contact Pressure: Under maximum rated axle load, contact pressure exerted on the C-17 cargo floor, ramp, or ramp toes must not exceed (50 psi) Airframe Protection & FOD Control: All base surfaces coming into contact with the aircraft floor or cargo ramp (ground wedges, ramp pads, stand bases) must feature smooth, durable, vulcanized or bonded synthetic/rubber belting to prevent metal-to-metal scoring All structural locking pins, lynch pins, and retaining hardware must be permanently captive/tethered via aircraft-grade lanyards to eliminate flightline Foreign Object Damage (FOD) Elevation Geometry & Vehicle Clearance: Compatible with tracked, wheeled, and winched equipment with tire/wheel outer diameters of 24 inches or greater Configurable to ramp crest elevations of: 13 inches to 15 inches 20 inches to 24 inches 34 inches to 38 inches Incline lead-in ground wedges provide smooth transition from 0 to 4 inches Rapid manual assembly achievable in under 15 minutes by a 2-3 person crew without specialized material handling equipment Kit Composition (Bill of Materials per 1 Complete Kit): Two (2) Matched Ramp Runs, each consisting of: Two (2) Heavy-Duty Ramp Sections (94" L x 36" W x 4" H) Two (2) Lead-In Ground Wedge Assemblies (0" to 4" elevation) One (1) Low-Height Modular Support Stand (13" to 15" range) One (1) Medium-Height Modular Support Stand (20" to 24" range) One (1) High-Elevation Modular Support…
Shortened here. The full text is in the buyer's notice.
Requirements
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS code
- 332312
- Product or service code
- 1740
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due27 Nov 2026
Due27 Nov 2026
Due27 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Pursue it in Capveon
Read the documents, check the requirements against your team and draft the response in one place.