Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Brown's Field Community Centre boiler and BMS replacement

Cambridge City Council, ENG. Due 8 Jan 2027.

At a glance

Brown's Field Community Centre boiler and BMS replacement is an other public bid from Cambridge City Council, in ENG. Responses are due 8 Jan 2027. The solicitation number is DN00000019. The buyer's notice has the documents and how to respond.

Overview

Buyer
Cambridge City Council
Place
ENG
Type
Bid
Solicitation number
DN00000019
Status
Open

Key dates

Posted
Not stated
Responses due
8 Jan 2027
Time and time zone
Not stated. Check the buyer's notice.

Summary

The buyer's description, as posted.

Category: works. The Brown's Field Community Centre has a TREND IQ246 BMS, gas boiler for heating, gas boiler for heating and extract ventilation systems that all need to be assessed and repaired/replaced. 1. BMS replacement will be based on an Trend IQ5x controller and retain the majority of controls equipment already installed on site, upgrading what is required to ensure the system can operate as required. All components of the system will be commissioned at the end of the project and demonstrated as commissioned to a Cambridge City Council representative. The existing IQ246 will be returned to Cambridge City Council. 2. Provide a panel-mounted touchscreen display (HMI) IQVIEWx-SCD for the Trend BMS to enable local plant room monitoring and control of the BMS. 3. The existing gas boiler and associated equipment not necessary to complete the project will be decommissioned and removed from site. An appropriate ASHP for connection to the existing four under floor heating manifolds will be installed and have the capability to provide cooling in a future project. All components of the system will be commissioned at the end of the project and demonstrated as commissioned to a Cambridge City Council representative. The under-floor heating will be controlled by the new Trend BMS system. 4. The existing domestic hot water boiler and associated equipment not necessary to complete the project will be decommissioned and removed from site. Instantaneous water heaters (and dedicated electrical circuit) will be supplied to 10 rooms and domestic hot water flow and return pipework will as far as reasonably practicable be removed from the building. 5. Extract ventilation will be tested, repaired where possible, and where they cannot be repaired extract fans will be replaced with equivalent duty extract fan units that are capable of BMS integration. 6. THERMAL STORAGE CYLINDER OPTION: The additional option of a thermal storage cylinder should be proposed to allow generation of heating during off peak hours for use during the day. 7. DESIGN INFORMATION: Brown's Field Community Centre plantroom is approximately 10m away from the site boundary with residential neighbours just beyond. The ASHP system chosen will need to satisfy all noise restrictions both at commissioning and for the units' serviceable life of up to 20 years (assuming annual servicing and repairs completed). Heating, ventilation and air-conditioning installation work

Official notice

The buyer's own page for this bid, with its documents and any changes.

Read the buyer's notice

  1. Due27 Nov 2026

  2. Due27 Nov 2026

  3. Swiftwater and Flood Boat Rescue Operator Training

    South Yorkshire Fire and Rescue Authority, ENG

    Due27 Nov 2026

  4. Due27 Nov 2026

  5. Fire Dampers at University Hospitals Dorset

    University Hospitals Dorset NHS Foundation Trust, ENG

    Due27 Nov 2026

  6. Due27 Nov 2026

  7. Due27 Nov 2026

  8. Due27 Nov 2026

Pursue it in Capveon

Read the documents, check the requirements against your team and draft the response in one place.

Start pursuing thisGet similar opportunities by email