Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

Boiler Room Upgrade at Kensington Palace

The Royal Household, ENG. Due 11 Dec 2026.

At a glance

Boiler Room Upgrade at Kensington Palace is an other public bid from The Royal Household, in ENG. Responses are due 11 Dec 2026. The solicitation number is 0112/PPTO. The buyer's notice has the documents and how to respond.

Overview

Buyer
The Royal Household
Place
ENG
Type
Bid
Solicitation number
0112/PPTO
Status
Open

Key dates

Posted
Not stated
Responses due
11 Dec 2026
Time and time zone
Not stated. Check the buyer's notice.

Summary

The buyer's description, as posted.

Category: works. The works are located within the Boiler Room serving the offices in apartments at Kensington Palace. The project comprises the replacement of the existing end-of-life atmospheric gas boilers with new high-efficiency condensing boilers, together with the installation of new hot water cylinders, associated pipework, valves and plate heat exchangers. The new heating system shall be designed to facilitate future connection to a heat network, which is currently being investigated through a joint RHPS/HRP feasibility study. The existing boiler flues, originally designed for atmospheric boilers, shall be surveyed and either replaced or relined as required to suit the new plant. The Contractor shall also assess the adequacy of the existing gas supply and undertake any necessary upgrades, including the replacement of obsolete mechanical gas drop safety valves with modern electrically operated solenoid valves. The works shall include, but not be limited to: •Removal and disposal of existing boilers, associated plant and redundant equipment. •Installation, testing and commissioning of new condensing boilers. •Installation of new hot water cylinders, plate heat exchangers, pipework, valves and associated ancillaries. •Survey, replacement and/or relining of existing flues as required. •Upgrades to the gas supply infrastructure where necessary. •Removal and replacement of all electrical installations and equipment required to serve the new plant. •Cleaning, flushing and dosing of the existing heating system to protect both the new plant and retained system components. •Replacement of all thermostatic radiator valves (TRVs) and lockshield valves. •Associated builders' work, making good and redecoration of the plant room upon completion of the works. •Testing, commissioning and provision of all relevant certification, operation and maintenance manuals, and handover documentation. The completed installation shall provide a significantly improved level of energy efficiency compared with the existing system while maintaining reliable heating and hot water services and enabling future integration with a district heat network. Boiler installations

Official notice

The buyer's own page for this bid, with its documents and any changes.

Read the buyer's notice

  1. Due27 Nov 2026

  2. Due27 Nov 2026

  3. Swiftwater and Flood Boat Rescue Operator Training

    South Yorkshire Fire and Rescue Authority, ENG

    Due27 Nov 2026

  4. Due27 Nov 2026

  5. Fire Dampers at University Hospitals Dorset

    University Hospitals Dorset NHS Foundation Trust, ENG

    Due27 Nov 2026

  6. Due27 Nov 2026

  7. Due27 Nov 2026

  8. Due27 Nov 2026

Pursue it in Capveon

Read the documents, check the requirements against your team and draft the response in one place.

Start pursuing thisGet similar opportunities by email