Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

ATR Loop Pressurizer Fabrication

ClosedBATTELLE ENERGY ALLIANCE–DOE CNTR (ENERGY, DEPARTMENT OF), Idaho. Was due 7 Nov 2026.

At a glance

ATR Loop Pressurizer Fabrication is a federal contract from BATTELLE ENERGY ALLIANCE–DOE CNTR (ENERGY, DEPARTMENT OF), in Idaho. Responses were due 7 Nov 2026. It is closed and no longer taking bids. It was posted 26 Oct 2026. The solicitation number is INL-27-001. The buyer's notice has the documents and how to respond.

Overview

Buyer
BATTELLE ENERGY ALLIANCE–DOE CNTR (ENERGY, DEPARTMENT OF)
Place
Idaho
Type
Federal contract
Solicitation number
INL-27-001
Status
Closed

Key dates

Posted
26 Oct 2026
Responses due
7 Nov 2026
Time and time zone
Not stated. Check the buyer's notice.

Summary

The buyer's description, as posted.

INTRODUCTION Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors capable of fabricating an ASME Section VIII, Division 2 pressure vessel for use as the ATR Loop Pressurizer (1A-NE Loop). The fabricated vessel will play a critical role in maintaining system pressure, degassing, and surge compensation for an Advanced Test Reactor (ATR) experiment loop. BACKGROUND INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. The ATR experiment loops rely on a dynamic pressurizer system to maintain primary coolant pump pressure, provide a means of degassing the primary coolant, and compensate for pressure surges. BEA is requesting vendor capability statements for the fabrication of a vertically oriented, leg-mounted pressure vessel with radial side arms, built to strict nuclear, metallurgical, and structural performance standards. Project-specific INL drawings, design calculations, and procedural references will be furnished to selected vendors. The scope of work includes the following: Fabrication, inspection, and physical testing of one (1) ASME Section VIII, Division 2 stainless steel pressure vessel with associated appurtenances (vessel, mounting leg stand, spray nozzles, lifting lugs), per INL Drawings 1050604, 1050605, and 1050606 Supply of all materials associated with the vessel and appurtenances Hydrostatic testing at room temperature in accordance with ASME code (minimum test pressure 3415 psig, +100/-0 psig tolerance) Load testing and documentation of lifting lugs Shop drawing development and submission through INL's vendor data system Shipping/handling pallet and container for horizontal-orientation transport, forklift-compatible Delivery to WestOne Logistics, Idaho Falls, ID The scope of work does not include the following: Installation at the Contractor's facility Procurement and installation of clamp-on heaters Vessel insulation Design, seismic analysis, thermal analysis, stress analysis, or fatigue analysis Overpressure protection (provided by a separate direct spring relief valve) Floor mounting plate APPLICABLE CODES AND REFERENCES The fabrication and associated documentation must comply with the following (as applicable to component type): ASME Section VIII, Division 2 (2025) AISC 370 (2021) ANSI/AISC N690-18 (Nuclear Facility Steel Structures) ASCE 4-16 and ASCE 43-19 (Seismic Design) ASME NQA-1 (2022 edition) DESIGN REQUIREMENTS Vendors should have demonstrated experience with nuclear-grade pressure vessel fabrication and must meet or exceed the following design conditions: Materials & Components: Vessel and lifting lugs: Type 347 stainless steel Mounting legs: Type 316 stainless steel Vertically oriented, leg-mounted vessel with elliptical heads and four (4) radially arranged side arms Pressure & Temperature Ratings: Vessel Internal Design Pressure: 2500 psig Vessel Design Temperature: 668 degreesF Normal Operating Pressure: 300-2208 psig; Normal Operating Temperature: 422-650 degreesF Heater Leg Design Pressure: 2500 psig; Heater Leg Design Temperature: 800 degreesF Vessel designed to Section VIII with seismic input per ASCE 4 and ASCE 43 (stand per AISC 370/N690) Fluid Service: High-purity, radioactive, demineralized water; pH range 5.0-11.0 Dissolved solids ≤10 ppm, suspended matter ≤3 ppm, chlorides ≤0.5 ppm, dissolved gas ≤150 cc/kg Cyclic Service: Pressurizer cycled between ambient and normal operating pressure 18 times/year over a 60-year design life (1,080 total cycles) Inspections & Engineering Approval: All pressure boundary welds (butt welds, with limited exceptions) inspected per ASME VIII/NDE requirements, including full volumetric inspection of all four side-arm weld joints Fabrication drawings and calculations submitted for formal BEA…

Shortened here. The full text is in the buyer's notice.

Official notice

The buyer's own page for this bid, with its documents and any changes.

Read the buyer's notice

All federal contracts
  1. 6550 Reagents Consumables Microbiology Testing Boise VAMC

    260-NETWORK CONTRACT OFFICE 20 (36C260) (VETERANS AFFAIRS, DEPARTMENT OF), ID

    Due28 Nov 2026

  2. New Meadows Range Barn

    PAYETTE NATIONAL FOREST (AGRICULTURE, DEPARTMENT OF), ID

    Due29 Nov 2026

  3. New Meadows Range Barn

    PAYETTE NATIONAL FOREST (AGRICULTURE, DEPARTMENT OF), ID

    Due29 Nov 2026

  4. Due30 Nov 2026

  5. RFQ-FA489727Q0006-Deployment Gear

    FA4897 366 FAS PKP (DEPT OF DEFENSE), ID

    Due30 Nov 2026

  6. PURCHASE AND INSTALL OF MULTIPLE COMPONENTS ON A 2024 FORD F-350

    GSA/FAS/TTL/QMD/MCC (GENERAL SERVICES ADMINISTRATION), ID

    Due1 Dec 2026

  7. Y1DA--CON NRM 531-25-102 | Expand Emergency Room

    260-NETWORK CONTRACT OFFICE 20 (36C260) (VETERANS AFFAIRS, DEPARTMENT OF), ID

    Due1 Dec 2026

  8. Lenel OnGuard system with LenelS2 physical security solutions

    NAVSEA WARFARE CENTER (DEPT OF DEFENSE), ID

    Due1 Dec 2026

Find the next one

This one has closed. Get the open bids that fit what you sell by email.

Get similar opportunities by email