Skip to content

Capveon III is here: sell to government in the US, Canada and the UK.Read more

AFRL RISE 2808a AOI: Facility Alteration & Space Optimization – Bombers Directorate Hallway Project (Bldg 556)

FA8652 AFRL HQ AFRL/PK (DEPT OF DEFENSE), Ohio. Due 5 Dec 2026.

At a glance

AFRL RISE 2808a AOI: Facility Alteration & Space Optimization – Bombers Directorate Hallway Project (Bldg 556) is a federal contract from FA8652 AFRL HQ AFRL/PK (DEPT OF DEFENSE), in Ohio. Responses are due 5 Dec 2026. It was posted 23 Nov 2026. The solicitation number is FA2396-27-9CTBD. Its NAICS code is 236220. The buyer's notice has the documents and how to respond.

Overview

Buyer
FA8652 AFRL HQ AFRL/PK (DEPT OF DEFENSE)
Place
Ohio
Type
Federal contract
Solicitation number
FA2396-27-9CTBD
Status
Open

Key dates

Posted
23 Nov 2026
Responses due
5 Dec 2026
Time and time zone
Not stated. Check the buyer's notice.

Summary

The buyer's description, as posted.

This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. Section 2808a. Refer to the attached AOI document and attachments for submission instructions, technical requirements, and assessment criteria. To optimize the work environment and facility functionality for personnel in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio. This project transforms an existing standard entrance hallway into a modern, motivating environment that reinforces the strategic deterrence mission and heritage of the USAF Bombers community through bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancement using existing space and structures. Target Timeline: The entire project must be completed within ninety (90) calendar days of award: Stage 1 Design Plan (30 days), Stage 2 Sourcing & Fabrication (60 days), and Stage 3 Physical Implementation & Closeout (90 days). On-site physical installation shall not exceed thirty (30) calendar days from physical site commencement and shall not restrict access to 2nd Floor restroom facilities for more than thirty (30) contiguous minutes.

Requirements

NAICS code
236220
Product or service code
Z1JZ

Official notice

The buyer's own page for this bid, with its documents and any changes.

Read the buyer's notice

All federal contracts
  1. NANO-AEROSOL HYGROSCOPICITY- CLOUD CONDENSATION ANALYZER

    FA8601 AFLCMC PZIO (DEPT OF DEFENSE), OH

    Due27 Nov 2026

  2. Forest Inventory Analysis (FIA) BPA for CALL 58 OHIO SOUTH

    USDA-FS, CSA EAST 9 (AGRICULTURE, DEPARTMENT OF), OH

    Due27 Nov 2026

  3. FIA BPA CALL 59 Ohio West

    USDA-FS, CSA EAST 9 (AGRICULTURE, DEPARTMENT OF), OH

    Due27 Nov 2026

  4. FIA BPA CALL 60 Ohio East

    USDA-FS, CSA EAST 9 (AGRICULTURE, DEPARTMENT OF), OH

    Due27 Nov 2026

  5. Notification of Intent to Sole Source - Flight Research Facility (Hangar) at NASA’s Glenn Research Center (GRC)

    NASA GLENN RESEARCH CENTER (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION), OH

    Due29 Nov 2026

  6. Due30 Nov 2026

  7. NGC

    FA8611 AFLCMC WAUK F22 (DEPT OF DEFENSE), OH

    Due30 Nov 2026

  8. Due30 Nov 2026

Pursue it in Capveon

Read the documents, check the requirements against your team and draft the response in one place.

Start pursuing thisGet similar opportunities by email