140-ton 10-foot Hydraulic Press Brake
At a glance
140-ton 10-foot Hydraulic Press Brake is a federal contract from W7NK USPFO ACTIVITY MTANG 120 (DEPT OF DEFENSE), in Montana. Responses were due 17 Sep 2026. It is closed and no longer taking bids. It was posted 13 Sep 2026. The solicitation number is W50S7L-26-Q-A004. It is set aside: Total Small Business Set-Aside (FAR 19.5). Its NAICS code is 333517. The buyer's notice has the documents and how to respond.
Overview
- Buyer
- W7NK USPFO ACTIVITY MTANG 120 (DEPT OF DEFENSE)
- Place
- Montana
- Type
- Federal contract
- Solicitation number
- W50S7L-26-Q-A004
- Status
- Closed
Key dates
- Posted
- 13 Sep 2026
- Responses due
- 17 Sep 2026
- Time and time zone
- Not stated. Check the buyer's notice.
Summary
The buyer's description, as posted.
Amendment 5 The purpose of this amendment is to provide answers to questions that have been received up to 9/13/2026 and to change the required delivery date on CLIN 0001/0002 to 31 January 2026. Does any wage determination, prevailing wage schedule, Service Contract Labor Standards requirement, certified payroll requirement, or contractor trade-license requirement apply to CLIN 0002? No, it does not apply The requirement calls for certified heavy machinery riggers, while Amendment 4 states that riggers will need Real ID for facility access. Is any specific rigger certification or license required in addition to the Real ID and EAL access requirements? No specific rigger certifications or licenses are required Our understanding of Amendment 4 is that the on-site installation electrician will perform the final electrical connection, and that the contractor/manufacturer should not include facility-side electrical wiring to the disconnect/panel. Please confirm. The on-site electrician will perform the final connection The solicitation pricing schedule lists CLIN 0002 as quantity 1, unit EACH, while the current notice description identifies CLIN 0002 as quantity 1 Job (JB). Which unit should quoters use on the completed pricing schedule? Each or Job is acceptable as long as the quantity is 1 (one) We have a machine option that meets the technical as well as DFAR requirements, however, the manufacturer is currently quoting approximately 14-16 weeks for delivery. Is November 30 a firm required delivery date, or would the Government consider an otherwise compliant offer with a delivery date beyond November 30 (approximately 1 month later)? The November 30 delivery date is the Government's preferred delivery target; however, it is not a mandatory pass/fail technical threshold. The Government will consider and evaluate technically compliant quotes that propose a firm delivery and installation completion date on or before December 31. Offerors must explicitly state their best realistic delivery lead time (in weeks after receipt of order) within their technical proposal, which will be binding upon contract award. End Amendment 5 Amendment 4 The purpose of this amendment is provide answers to questions that have been received up to 9/10/2026. The solicitation includes FAR 52.225-3/52.225-4 and provides for identification of "Other Foreign End Products"; however, the solicitation also states that the offered machine must be manufactured in the United States, a DFARS qualifying country, or a TAA-compliant country. Please confirm whether an end product manufactured in China may be offered and evaluated under FAR 52.225-3, or whether Chinese-origin equipment is specifically excluded from consideration. Equipment manufactured in the People's Republic of China (or any other non-qualifying, non-TAA compliant country) is SPECIFICALLY EXCLUDED from consideration and will be evaluated as TECHNICALLY UNACCEPTABLE. Can you provide more details on the electrical run. Conduit type, for instance. Will it be overhead or along a wall? Is a scissor lift required for electrical install? In the RFQ, it stated that the government would wire to a disconnect and only the final connections would need to be made. The additional information provided, seems to contradict the RFQ by stating that the electrical would be run from the main panel? Conduit is in the floor, installation electrician is on site, electrical panel is 35-40 ft away. Does the electrician need special certifications to work onsite? Installation electrician is on site Also, for the riggers, do they need special certifications to work onsite?" They will need a Real ID to get on base. Electrical Connection: Further clarification is needed. Please confirm that the Government/end user will provide the electrical drop, disconnect, and required electrical connection so that the machine can be connected and placed into service at installation. By law, the manufacturer or rigging contractor cannot…
Shortened here. The full text is in the buyer's notice.
Requirements
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS code
- 333517
- Product or service code
- 3441
Official notice
The buyer's own page for this bid, with its documents and any changes.
Related open bids
Due30 Nov 2026
Due30 Nov 2026
Due30 Nov 2026
Due1 Dec 2026
Due4 Dec 2026
Due4 Dec 2026
Due4 Dec 2026
Due5 Dec 2026
Find the next one
This one has closed. Get the open bids that fit what you sell by email.