Skip to content

Capveon III is here: sell to government in 14 countries.Read more

Start every response with the whole package read

Capveon reads the solicitation, the attachments and every addendum, turns each requirement into a checklist item with an owner and a date, and writes first drafts from your past responses. Your team starts at review.

Or see your top 10 bids, free

A thick bid specification with tabs, open beside rolled drawings
Lakemont County, OhioDraft ready
Every requirement listed with its page. Safety plan drafted
Addendum 2 appliedDue 19 Dec p. 2

Skip the first read. Start at review.

  • 200 pages to build the matrix by hand

    Every requirement listed with the page it came from, before kickoff.

  • An addendum two days before the deadline

    Capveon reads it, marks what changed and updates the checklist.

  • Boilerplate copied from old proposals

    First drafts written from your past responses, each passage citing its source.

Every requirement, found and cited

Capveon reads the whole package, specifications, forms, drawings and addenda, and lists what the response must include: the bond, the insurance, the forms, the page limits, the evaluation criteria. Each item links to its page.

  • Reads every page and addendum
  • Catches the buried pre-bid and the page limit
  • Each requirement cites its page
Bid bond10% of the bid
p. 7
Pre-bid meeting18 Nov, mandatory
p. 2
Page limitForms do not count
p. 3
Evaluation criteriaApproach, team and cost
p. 11

First drafts from what you already wrote

Add your past proposals, templates, references and security answers. Capveon drafts each section from them, cites the document every passage came from and leaves what is new for your writers.

  • Company details, references and insurance filled in
  • Each passage cites the document it came from
  • Owners and due dates on every item
A woman working on a laptop at a desk by a window
Safety planDraft ready
Written from your last two responses, each passage with its source
Owner: KenjiDue 25 Nov

Every addendum read, and the change flagged

When an addendum changes the due date, the scope or the specification, the bid updates and everyone working the response is told what changed, so a new form does not slip through.

  • Due date, scope and forms read again
  • What changed, in one line
  • Sent by email, Slack or Teams
Addendum 2 postedBids now due 19 Dec, was 12 Dec
Date changed
Addendum 1 postedAdds a subcontractor list form
New form
Clarifier No. 2 replacementLakemont County, Ohio
Up to date

Send one bid. Get it back read for your products.

Pick any public bid. We send it back read against what you make, each answer with its page.

Send a bid

Every product reads from the same record of each public buyer.

See the platform
  • Early signals

    Projects in meetings, budgets and plans, months before the bid.

  • Spend

    What every agency buys, from whom, and for how much.

  • Contacts

    Who decides, and how to reach them.

Resources for proposal teams

All resources

Questions, answered

Something else? Talk to us

Can Capveon build a compliance matrix from an RFP?

Yes. It reads the solicitation, attachments and addenda and lists each requirement, form and deadline as a checklist item with the page it came from. Your team assigns owners and checks it off.

Does Capveon write proposals?

It writes first drafts from your past responses and templates, and each passage cites the document it came from. Your writers edit, add what is new and approve. Nothing is sent without a person.

What happens when an addendum is issued?

Capveon reads it, shows what changed and updates the checklist, so a changed due date or a new form does not slip through.

Is our proposal library used to train AI?

No. Your past bids and proposals are used to draft for your team alone, and none of it trains a model.

Bring a bid you are working on

We'll read it together in the demo: the requirements, the dates and a first draft from material like yours.

Or see your top 10 bids, free