Basis of design: how manufacturers get written into specs, and out of them

Explainer. August 11, 2026. 8 minute read.

Specified revenue is the cheapest revenue a manufacturer has. It is won during design and lost in addenda.

Water treatment plant on the bay shore, Redwood City, California

When an engineer designs a treatment plant or a transmission main, they select a basis of design for major equipment and materials: a specific product whose performance the design assumes. The specification is then written around it. Other manufacturers may be permitted through “or approved equal” language, or excluded through requirements only one product meets.

This decision is usually made between thirty and ninety percent design, by a person whose name is in a public design award, months before the specification is published.

The three states of a specification section

Named. Your product is the basis of design or a listed acceptable manufacturer. Protect it: addenda can remove names.

Competitor named. Another manufacturer is named. Read the performance criteria and the substitution provisions. If or-equal language is present, there is a path. If the section requires a proprietary test or dimension, there is not, unless the engineer changes it before bid.

Nobody named. The section describes performance and names no one. This is the most valuable state and the least visible, because searching a PDF for your name finds nothing. Reading the criteria against your catalog does.

Where it is lost

Addenda. A late addendum can strike or-equal language, add a named manufacturer or tighten a criterion. Addenda are short, published under deadline pressure, and rarely reread by sales teams.

Version drift. Between sixty and ninety percent, sections change. A product named at sixty can be gone at ninety without anyone outside the design team noticing.

What a manufacturer's morning should look like

Three lists: where you are named, where a competitor is named, and where the section describes what you make and names no one. For each, the engineer of record and the phase, so you know whether it can still change. That is the output Capveon produces from the specifications in a territory, continuously.

Oroville Dam spillway releasing water, February 2017, California

Bring the work you’re looking at.

Thirty minutes on your own projects. We go through what each one is, whether it’s yours, and what to do next.

Book My DemoNothing to install.

Bring the work you’re looking at.

Pick a time, and bring a project or two you’re looking at, or the market you want to be in. We go through it with you.

Length
Thirty minutes.
After
You know what Capveon would do with your work, or that we are not a fit.

Calendar not loading? Open it in a new tab or write to hello@capveon.ai.