McNary Lock and Dam, Columbia River

Know what federal agencies will build next.

Forecasts, solicitations and grants from every agency, read for what fits your work.

McNary Lock and Dam, Columbia River. CC BY 2.0, Bonneville Power Administration.

A solicitation is two hundred pages and a deadline.

Federal work is posted in one place and explained in many: the notice, the attachments, the forecast that came before it, the grant that pays for it downstream. The requirement that rules you out is usually on page ninety.

Reading them all takes a team most firms do not have.

One notice, read for you.

What it asks for, whether it fits, and the page that says so.

Lock and dam electrical rehabilitation

Army Corps of Engineers district, sources sought.

Stage
Sources sought, solicitation planned for the spring
Scope
Electrical and controls rehabilitation at two locks, attachment B
Set-aside
Small business, NAICS 237990
Requirements
Bonding and past performance on similar federal work
Timing
Award expected in the fourth quarter

Worth a capability response before the solicitation.

Boone Dam from the air, Tennessee, 2015
Boone Dam from the air, Tennessee, 2015. Tennessee Valley Authority.

See it in the forecast.

Agency procurement forecasts, sources sought and pre-solicitation notices, read for the work you do, months before the solicitation.

  • Agency forecasts and sources sought
  • Set-asides and NAICS codes
  • Kept current as it moves
Getting in early, in detail
Robotic inspection crawler, 221-H canyon, Savannah River Site, South Carolina
Robotic inspection crawler, 221-H canyon, Savannah River Site, South Carolina. DOE SRNS 221-H.

Know what a solicitation asks for.

Every notice and attachment read in full: scope, set-aside, bonding, past performance, Buy American and Davis-Bacon terms, and the deadline, each with the page it came from.

  • Scope and attachments
  • Set-asides and requirements
  • Every answer cites its page
Reading specs and drawings, in detail
El Vado Reservoir and the Rio Chama from the air, New Mexico
El Vado Reservoir and the Rio Chama from the air, New Mexico. CC0, Matt Nelson.

Follow federal money to local work.

Grants and loans from EPA, DOT and other agencies pay for much of the local wastewater and transportation work. Capveon follows each award to the project it pays for, and the bid it becomes.

  • Grants.gov and USAspending
  • State programs funded by federal money
  • The local bid it becomes
Following the funding, in detail

Questions about federal work

Which federal sources do you read?
SAM.gov, agency forecasts, USAspending, Grants.gov and the Federal Register, plus the state programs federal money flows through.
Which agencies?
Civil works, military construction, transportation, energy, land and water agencies, among them the Army Corps of Engineers, the Navy and Air Force facilities commands, the Bureau of Reclamation and the Federal Highway Administration.
Does it read the attachments?
Yes. The notice and every attachment, so the requirement on page ninety is found on day one.
What happens on the demo?
Bring a few notices or agencies you are working. We go through what each one asks for and whether it fits.
Spillway chute, Keechelus Dam, Yakima River, Washington

Bring the work you’re looking at.

Thirty minutes on your own projects. We go through what each one is, whether it’s yours, and what to do next.

Book My DemoNothing to install.

Bring the work you’re looking at.

Pick a time, and bring a project or two you’re looking at, or the market you want to be in. We go through it with you.

Length
Thirty minutes.
After
You know what Capveon would do with your work, or that we are not a fit.

Calendar not loading? Open it in a new tab or write to hello@capveon.ai.