Formwork and scaffolding on the Folsom Dam auxiliary spillway, California

Know which projects are yours in minutes, not days.

Capveon checks every public project against what you make or build, where you work and the size you take on, and tells you which are worth your time, with the reasons.

Formwork and scaffolding on the Folsom Dam auxiliary spillway, California. U.S. Army Corps of Engineers, Sacramento District.

A hundred projects come in. A handful are worth it.

Telling them apart means opening each one, reading enough to know, and deciding from memory. A big project can be a small job for you. A small one can be exactly yours. The size on the listing does not say which.

How it runs

A person on your team approves before anything is written to a system you run.

  1. Gather

    Every project in your area, from the public record and the services you already use, in one place.

  2. Check

    Against what you make or build, where you work and the size you take on.

  3. Explain

    Why each one is or is not for you, with the pages behind it.

  4. Rank

    The ones worth your time first. Your team makes the call.

What goes in

  • Projects from the public record
  • Your lead services
  • What you make or build
  • Where you work

What comes out

  • Which projects are yours, and why
  • How much of each one is yours
  • The reasons behind every pass

What it produces

Every field links to where it came from.

Lift station rehabilitation

In your area, this morning.

Fit
Yours. Bypass pumping and wet well coating, scope section 2.3
Size
$3.8M, in your usual range
Watch
Needs a state-certified coatings applicator
Next
Worth a look this week

Three other projects this morning were not, and each one says why.

Water treatment plant on the bay shore, Redwood City, California
Water treatment plant on the bay shore, Redwood City, California. CC0, Alfred Twu.

Works with what you already run

  • Dodge
  • ConstructConnect
  • Citylitics
  • Salesforce
  • HubSpot

Questions

Does this replace our lead service?
No. It reads what your lead service delivers alongside the public record, and does the reading after.
Can we change what it looks for?
Yes. What counts as yours is written out where you can see it and change it.
Who makes the call?
Your team. Capveon gives the reasons and the pages; you decide.
Oroville Dam spillway releasing water, February 2017, California

Bring the work you’re looking at.

Thirty minutes on your own projects. We go through what each one is, whether it’s yours, and what to do next.

Book My DemoNothing to install.

Bring the work you’re looking at.

Pick a time, and bring a project or two you’re looking at, or the market you want to be in. We go through it with you.

Length
Thirty minutes.
After
You know what Capveon would do with your work, or that we are not a fit.

Calendar not loading? Open it in a new tab or write to hello@capveon.ai.